26016-10000-15100
PC Info Complete
Voluntary lateral force-resisting system improvement per 2025 California Existing Building Code Section 503.13.Voluntary improvements targeting the mitigation of vertical discontinuity irregularity at two (2) corner columns. Columns supporting discontinuous walls are wrapped with horizontal FRP for confinement. · 2026-08-07
Installation of roof equipment · 2026-08-03
[ePlan] Full plan check for the expansion of the existing sterile processing department at Kaiser Permanente. Scope of work includes the installation of new panels, circuits, lighting, and controls. · 2026-07-28
Tenant Improvement SPD Expansion · 2026-06-30
HVAC TENANT IMPORVEMENT TO EXISING MEDICAL OFFICE BUILDING ON THE 5TH FLOOR, 6TH FLOOR AND ROOF. · 2026-06-30
[E-Plan] (T-24) 9,246 SQFT INTERIOR TENANT IMPROVEMENT OF ELEVATOR LOBBY'S, CIRCULATION SPACES AS WELL AS DEPARTMENTAL RECEPTION AND WAITING AREAS OF AN EXISTING 6-STORY MEDICAL OFFICE BUILDING, SCOPE OF WORK INCLUDES THE FOLLOWING:1. REPLACEMENT OF (E) WALL MOUNTED LINEAR LIGHT FIXTURE WITH NEW LINEAR LIGHT FIXTURES.2. NO CHANGE IN USE TO THE EXISTING BUILDING IS BEING PROPOSED.3. THIS BUILDING IS NOT AN OSHPD-3 BUILDING · 2026-06-15
25016-10000-28764
Verifications in Progress
eplan TENANT IMPROVEMENT OF ELEVATOR LOBBY'S, CIRCULATION SPACES AS WELL AS DEPARTMENTAL RECEPTION AND WAITING AREAS OF AN EXISTING 6-STORY MEDICAL OFFICE BUILDING THAT INCLUDES:1. SELECTIVE REMOVAL OF EXISTING CEILING TILES, FLOORING, WALL FINISHES, CASEWORK, AND ELECTRICAL FIXTURES2. PATCH AND REPAIR OF EXISTING NON-LOAD BEARING PARTITIONS, APPLICATION OF NEW WALL COVERINGS, NEW CEILING TILES, NEW FLOOR FINISHES AND NEW ELECTRICAL FIXTURES. 3. NO PLUMBING SCOPE IS INCLUDED IN THIS PROJECT AND · 2026-06-01
[eplan] t24 Remove existing exterior building sign and replace with new. · 2025-05-01