Permit type: Express Electrical Permit Scope: One-for-one replacement Quantity: 50 or fewer luminaires per complete floor or tenant space, if that accurately reflects the actual project Load: Lower than existing Circuits: Existing circuits remain Controls: Existing controls remain functional Emergency systems: Excluded Fixture locations: Unchanged · 2026-09-11
NEW CONCRETE PAD FOR MECHANICAL UNIT AND ALTERATIONS OF (E) RAMP · 2026-06-08
TENANT IMPROVEMENT. GENRAL HVAC · 2026-06-08
Provide power for new replacement HVAC units, Power ASHP skid, power for new VRR equipment. Power plan check. · 2026-06-08
INSTALL 2 MECHANICAL UNITS, EQUIPMENT, AND CATWALK ON (E) ROOF · 2026-06-08
NEW COOLING TOWER EQUIPMENT INSTALLED ON ROOF. NO BUILDING ENVELOPE MODIFICATIONS ARE PROPOSED. NO CHANGES TO THE EXISTING OCCUPANCY, USE, OCCUPANT LOAD, OR EGRESS SYSTEM. · 2026-06-05
Revision to cooling tower water pump piping return and supply configuration in 1st floor pump room. Modifications to cooling tower piping at cooling towers, including piping connections to new treatment skids. · 2026-06-03
Revision to cooling tower water pump piping return and supply configuration in 1st floor pump room. Modifications to cooling tower piping at cooling towers, including piping connections to new treatment skids. · 2026-06-03
FIXTURE CHANGOUTS · 2026-04-27
CHANGING THE SIZE OF 4 LOADS ON THE MOTOR CONROL CENTER SWICTHBOARD FROM 75 HP TO 100 HP. ADDING 225A SUBPANEL WITH NEW LOADS. CHANGE TO FEEDER SIZES · 2026-04-17
SPRINKLER TI. ADDITION AND RELOCATION OF HEADS. · 2025-04-10
[E-Plan] T-24 plan check for a TI to existing space. New connected load is less than 400A. THE SCOPE OF THIS PROJECT IS THE TENANT IMPROVEMENT OF AN EXISTING OFFICE AREA ON THE SECOND FLOOR LEVEL TO A NEW CLEAN ROOM AREA AND NEW ROOFTOP MECHANICAL EQUIPMENT.SCOPE INCLUDES ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, AND PLUMBING. · 2025-04-09