New mat foundation and concrete pads for new polymer system equipment (26'-10"x22'-7"). · 2026-08-27
*eplan* Structural repairs and improvements.Replace sludge and scum collection system; pumps, chains and flights.Install new aluminum covers and replace HPE piping system.Automate influent gates.Three inlet wall spools per tank Total 18One new manual slide gate · 2026-08-11
26016-10000-12954
Quality Review Completed
Eplan:1.. Install a prefabricated metal enclosure which will house 4 uninterruptible power supply units (UPS) on the concrete deck of the Chlorine Contact Tank (CCT) at Terminal Island Water Reclamation Plant (TIWRP).2. Install an overhead conduit bridge from the proposed enclosure on the CCT to the Motor Control Center (MCC) building. · 2026-07-30
19041-10001-35851
PC Info Complete
EPLAN. CHANGES TO APPROVED SET. CHANGES INCLUDE CHANGES TO SINGLE LINE DIAGRAM, FLOOR PLANS, EQUIPMENT LAYOUTS, NEW PAGES, TWO NEW MOTORS, AND CHANGE TO ENGINEER ON RECORD.We are requesting a supplemental application. Master application provided under LADBS Application Permit No. 19041-10000-35851 and Plan Check No. E19LA04079 · 2026-07-27
ePlan. 4'x4' new opening in existing concrete wall of the Digester Gas Compressor Building for new ventilation fan system. No change in building footprint. · 2026-07-17
[E-Plan] New Outdoor Flood Light System in general (None Hazardous) Area. T-24 Energy Only. Affected area: 29,666 SF. · 2026-01-07
Eplan;Plan check for an installtion of (2) panels with new equipment located in a waterreclmation plant Please see below for applican't detail reference. (((Furnish and install all conduit, supports, boxes, wiring, grounding, lighting, and devices 2. Furnish and install (2) 50 AT, 150AF circuit breakers to existing MCC 3. Tie into existing PCM02 4. Furnish and install grounding system5. Furnish and install Duct Banks per Duct Bank Detail Sheets6. Furnish and install Electrical switchgear which i · 2025-09-23