25041-10001-60178
Quality Review Completed
Supplemental Application to 25041-10000-60178Added power to HP 6-17 and HP 6-82 in Doctors Office 600.8A.2. Added power to HP 6-12 in Corridor.3. Added power receptacles and data outlet in (E) Assistant Office600.8C4. Added reference notes #6 through #105. Added nurse call light in both doors of Xray 601.7J6. Added card reader in north door of Xray 601.7J · 2026-09-08
New 12.92' x 46' window sign · 2026-08-28
(N) 157 sf window sign (WD-03) · 2026-08-26
One window sign: 31'L x 11'-3"W, Area = 349 sf, 28'-6" from bottom of sign to finished floor. · 2026-08-26
26044-10000-06236
PC Info Complete
GENERAL HVAC T.I. WITH EXISTING SMOKE CONTROL SYSTEM. · 2026-08-19
install new fire alarm devices · 2026-08-10
26048-10000-01464
Corrections Issued
PROPOSED 12'-11" X 46' SUPERGRAPHIC SIGN ON SOUTH BLDG. FACE (WD-02: "CEDARS SINA" WITH LOGO, FLAGS, OLYMPIC LOGOS AND "OFFICIAL PROVIDER OF TEAM U.S.A.") · 2026-08-08
26048-10000-01465
Corrections Issued
PROPOSED 8'-9" X 17'-11" SUPERGRAPHIC SIGN ON WEST BLDG. FACE (WD-03: "CEDARS SINAI" WITH LOGO, FLAGS AND OLYMPIC LOGO, "OFFICIAL PROVIDER OF TEAM U.S.A.") · 2026-08-08
26048-10000-01423
Corrections Issued
INSTALL 11'-3" X 31' S/F SUPERGRAPHIC SIGN ON NORTH BUILDING (WD-01: "CEDARS SINAI" WITH LOGO, FLAGS, OLYMPIC LOGOS, AND "OFFICIAL PROVIDER OF TEAM U.S.A.") · 2026-08-08
26041-10000-21727
PC Info Complete
(EPlan) Replace existing x-ray machine with new. Install new lighting in x-ray rooms. Provide power for new x-ray machines on 6th floor 601.7E AND 601.7H. Plan check for power and energy. · 2026-07-07
26016-10000-10797
PC Info Complete
ePlan: TENANT IMPROVEMENT TO (E) MEDICAL OFFICE FOR X-RAY EQUIPMENT REPLACEMENT IN EXISTING X-RAY ROOMS 601.7E AND 601.7H. AND CONVERSION OF EXISTING WORKSTATION 601.7F TO A STORAGE ALCOVE. · 2026-06-08
25041-10000-60178
PC Info Complete
[EPLAN] Convert open office and chairmen's office into X-ray room and doctor's office with new lighting and power in existing medical office building on 6th floor. Plan check for power and energy. · 2026-02-10
[Eplan] Full Plan Check for Gait Lab. Scope of work includes new lighting fixtures, new lighting fixture controls, and new circuits. Total area is 1100 sf. New Force Plate in *Methane Zone* · 2026-01-07