Permits at 4419 S METTLER ST

3 permits on file · Los Angeles, CA · from the official municipal record

26041-90000-01764 Permit Finaled

100amp temporary power pole · 2026-08-27

26041-90000-34253 Permit Finaled

Installation of a roof-mounted Microinverter/AC module solar photovoltaic (PV) system, not exceeding 38.4kW in a 1 or 2 family dwelling. · 2026-08-27

24019-20000-04914 Permit Finaled

eplan. DEMO (E) SFD 2000.0 SF · 2026-06-01

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.