(EPlan) Changes to an approved set, Updated panel schedule. Approval limited to clouded changes only. Plan check only. · 2026-08-08
Running Low Voltage cat6 wire for camera and data"COMPLY WITH DEPARTMENT ORDER effective date 01/22/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-07-20
[E-Plan] PLAN CHECK ONLY. DELTA 5 CLOUDED CHANGES TO APPROVED SET. GAS STATION HAZARDOUS AREA Change the reference notes from LADWP to CEC on Sheet E1.0. All others remain unchanged. · 2026-05-30
INSTALL (2) ROOF TOP PACKAGE HEAT PUMPS, INLETS/OUTLETS/ BATHROOM EXHAUST FAN, DUCT TYPE SMOKE DETECTORS AND WITNESS TEST. "COMPLY WITH DEPARTMENT ORDER effective date01/22/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-05-04
[E-Plan] Plan check only. Revise the servie entrance per DWP requirements. REVISIONS TO AN APPROVED SET UNDER DELTA 5 - SLD REVISIONSORIGINAL PERMIT SCOPE :PC FOR A NEW 600A 120/240V 3P 4W SERVICE FOR GAS STATION, C STORE AND DRIVE THROUGH CAR WASH. SYSTEM INCLUDES A NEW MSP, DOWNSTREAM PANELS AND DISTRIBUTION EQUIPMENT. A NEW 150 KVA XFMR. AREA FOR LIGHTING ENERGY COMPLIANCE IS 25,974 SQFT. · 2026-03-22
[EPLAN] PC FOR A NEW 600A 120/240V 3P 4W SERVICE FOR GAS STATION, C STORE AND DRIVE THROUGH CAR WASH. SYSTEM INCLUDES A NEW MSP, DOWNSTREAM PANELS AND DISTRIBUTION EQUIPMENT. A NEW 150 KVA XFMR. AREA FOR LIGHTING ENERGY COMPLIANCE IS 25,974 SQFT. · 2025-09-15
Revision to approved plans to add new fixtures to potable water, waste and vent systems. · 2025-08-11
Supplemental Permit for 23041-10000-70397. Due to LADWPs design revision to relocate the main switchboard near the C-store which was previouslylocated in the carwash equipment room. There are also some minor changes with the store equipment.We revised the Electrical plans to reflect those changes. · 2025-08-06