22043-10004-05413
Corrections Issued
*****LAX. Assign to Mark.*****Plan check for fire sprinkler system. · 2026-09-10
NCC Level 3 Gate 42A Tbar · 2026-09-02
**ePlan**LAX**Deferred submittal for base building permit# 21014-10000-03646Electrical overhead trapeze seismic bracing - MER (main electrical room) · 2026-09-01
Furnish and Install CCTV cameras and associated conduit and cable · 2026-08-26
T4 NCC Level 3 South Scaffold Soffits (23043-10000-02917) · 2026-08-24
Make changes to the previously approved plan. Plan check only. Permit fees paid under 23043-10000-02917. · 2026-08-17
NEW LIGHTING AT LAWA: TERMINALS 1 THROUGH TERMINAL 7 AND AT TBIT. ARRIVALS ; GARAGE CORE ELEVATORS ; DEPARTURE ; THEME BUILDING CANOPY 480566 SFT AND FACADE 108576 SFT PLAN · 2026-08-11
EplanSupplemental toPemit # 21014-10000-03646 for Deferred submittal of Installation of suspended metal ceilings (MCP-1, MCP-2, MCP-3, MCP-9, & ACP-2). · 2026-08-11
*****LAX. Assign to Mark.*****Plan check for cabled elevator. · 2026-08-06
T4 NCC L3 AA Customer Service/Gate 42 PBB Vestibule hard lids Relocate 10 and change 10 sprinklers · 2026-08-05
Make changes to the previously approved plan. Plan check only. Permit fees paid under 21044-10000-10188. · 2026-08-03
26016-10000-10498
PC Info Complete
**ePlan**LAX**LAWA project, not part of T4 modernization**(T4) Terminal 4 (4G, C-Band, & mmWave DAS) ProjectInstall proposed low-voltage DAS antennas on all levels of the existing terminal building (apron, departures, concourse, club, lower and upper roof).Install cabling and supporting equipment within the (2) IDF Rooms located on the departures & concourse levels of the existing terminal building. · 2026-07-31
Make changes to the previously approved plan. Plan check only. Permit fees paid under 2143-10000-01356. · 2026-07-27
**ePlan**LAX**Project Under Construction**Deferred submittal for permit number 21014-10098-03646 - Aluminum Storefront with glass and aluminum swing door · 2026-07-27
[ePlan] (PC ONLY) CHANGES TO APPROVED SET. LAX T4MP PANEL SCHEDULE UPDATES - REMOVING POWER FOR ARPON GATE SIGNS AT ROOF PARAPET AND POWER FOR DOORS. PC FOR CLOUDED CHANGES ONLY. BULLETIN 0039. · 2026-07-22
LAX project- Supplemental permit to 21014-10024-03646 for revisions to the approved plans for Electrical overhead trapeze seismic bracing in the MER (main electrical room) · 2026-07-17
Weld Inspection T4 NCC Level 3 South Scaffold Weld Check (23043-10000-02917) · 2026-07-07
T4 NCC Level 3 South Scaffold16 (1 for 1) sprinkler relocations for temp scaffold. · 2026-06-25
**ePlan**LAX**Supplemental to permit # 21014-10000-03646 : Deferred submittal for Interior metal studs framing. · 2026-06-24
Make changes to the previously approved plan. Plan check only. Permit fees paid under 23043-10000-03182. · 2026-06-22
Supplemental permit to 21014-10035-03646 for revisions to the approved plans for Electrical overhead trapeze seismic bracing - Level 1 HH Feeder Conduits. · 2026-06-18
**ePlan**LAX**Project Under Construction**Shoring for Terminal 4 Headhouse & Concourse foundations for phase 2, prior to old foundation demolition and new foundation install. Deferred supplemental plan check for revision under Permit #22016-10000-08325. · 2026-06-17
**ePlan**LAX**Project Under Construction**DEFERRED SUPPLEMENTAL PLAN CHECK FORREVISION UNDER PERMIT #22016-10000-15404. SHORING FOR TERMINAL 4 CONCOURSE FOUNDATIONSFOR PHASE 2, PRIOR TO OLD FOUNDATION DEMOLITION AND NEWFOUNDATION INSTALL. · 2026-06-17
Supplemental permit to 21014-10087-03646 for revisions to the approved plans for Electrical overhead trapeze seismic bracing - Level 1-4 Feeder Conduits. · 2026-06-11
T4 Lev. 1 Passenger Tunnel, aprox. 7' of 6" standpipe & 4" system main rerouted for hydronic (2-8" chiller lines) relocation. · 2026-06-08