24010-10001-01409
PC Info Complete
Attn Hernan ArreloaDeferred submittal to 24010-10000-01409 for cladding · 2026-09-08
26041-10000-19694
PC Info Complete
[EPLAN] Full plan check. New electrical panels, transformers and branch circuits in fire pump room. Total square footage = 560 sf · 2026-08-27
24042-10000-06216
Corrections Issued
GENERAL PLUMBING T.I WORK INCLUDES POTABLE WATER, WASTE &VENT WITH SEWAGE EJECTOR **B-Building** · 2026-08-07
26041-10000-15494
PC Info Complete
[ePlan] Central Plant Electrical Review. New lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 1133 sf. PC for EM Egress Lighting and T24 Energy. · 2026-06-15
24041-10000-40860
PC Info Complete
[eplan] 1Power and energy plan check for a TI to existing building with new electricalsystem. Scope includes new distribution, power, and lighting for renovation of church and site improvements. *** INTERNATIONAL HEADQUARTERS RETROFIT & REHABILITATION - SEISMIC RETROFIT AND REHABILITATION OF THE EXISTING 29,960 GSF 4-STORY CHURCH (NO CHANGE OF USE) GROSS SQUARE FOOTAGE WILL BE INCREASED BY 5,312 GSF FOR NEW OFFICES *** · 2026-06-05
24044-10000-08075
PC Info Complete
INSTALLATION OF MECHANICAL SYSTEM. INCLUDES GENERAL HVAC AND A2L REFRIGERANT. · 2026-05-27
26044-10000-03444
PC Info Complete
INSTALLATION OF VENTILATION SYSTEN IN FIRE PUMP ROOM · 2026-05-21
26042-10000-05868
Quality Review Completed
NEW PLUMBING SYSTEM. INCLUDES POTABLE WATER, WASTE AND VENT, RAINWATER, AND MEDIUM PRESSURE GAS SYSTEM. (BUILDING #1 UNDER BUILDING PERMIT 24014-10000-01310) · 2026-04-24
26041-10000-13153
PC Info Complete
[Eplan] Title 24 plan check for energy only. New security kiosk. Total area is 61 ft. · 2026-04-08
26042-10000-05976
Corrections Issued
INSTALLATION OF 5PSI MEDIUM PRESSURE GAS SYSTEM · 2026-04-03
26041-10000-02288
PC Info Complete
[ePlan] CABLE CAR BUILDING. Full plan check. Total affected area is 2,762 sf.RECONSTRUCTION OF AN EXISTING ONE-STORY WOOD FRAME STRUCTURE NEW MEETING ROOMS, NEW ADA ACCESSIBLE RESTROOMS, AND BASEMENT STORAGE SPACE. · 2026-03-19
24041-10000-16695
PC Info Complete
[EPLAN] T24 ENERGY ONLY PLAN CHECK FOR RENOVATION OF EXISTING VISITORS CENTER. NEW POWER LOADS AND LIGHTING ON EXISTING BRANCH CIRCUIT. TOTAL SQUARE FOOTAGE = 454 SF · 2026-03-04
26041-10000-02681
PC Info Complete
(EPlan) New commerical building, full power plan check. Scope of work includes new transformers, panels, and circuits/loads, and lighting.Total affected area: 9681 SF THE NEW 9,771 GSF GARDEN & MAINTENANCE WORKSHOPS INCLUDE MAINTENANCE SHOPS FOR GARDENING, WOODSHOP, STORAGE SPACES WORKSHOPS AND MAINTENANCE OFFICE SPACES. · 2026-03-02
Changes to a permitted set of plans. All changes are clouded.Attached is a list of the changes(((Power plan check for a distribution site with a newly installed load of over 400A. Scope of work includes installation of (50) new panelboards, distribution boards and transformers to existing distribution site. · 2026-02-09
24044-10000-07335
PC Info Complete
Plan check for heating, venting and air conditioning. · 2026-01-27
Supplemental changes. Plan check only. Permit fees paid under 24044-10000-07335. · 2026-01-22
25044-10000-14087
PC Info Complete
TENANT IMPROVEMENT. VOLUNTARY PLAN CHECK FOR NEW ENVIRONMENTAL EXHAUST ONLY. · 2025-12-24