**ATTENTION KATRINA ROBLES - LUCAS MUSEUM PROJECT**[Eplan] Supplemental to approved set. Updated the power for the new model patio heater and updates the electrical drawings to capture the engineers comments on the panelboard submittal. · 2026-09-09
Temp Power for grand opening at the Lucas Museum on 9/19/26. Inspection ready on 9/19/26. Contact Jay Triggs 763-360-5423. · 2026-09-02
Temp Power for soft opening at the Lucas Museum on 9/3/2026. Inspection ready 9/3/26. Contact Jay Triggs 763-360-5423. · 2026-09-02
26016-20000-21093
Quality Review Completed
*eplan*ATTENTION QUAN NGHIEM. Under Construction. LUCAS MUSEUM PROJECT. Scope: Bulletin to add a safety gate to the Level 4 landing at Stair 7 and to add a magnetic hold-open to existing door. · 2026-08-27
*eplan* Attn: Quan Nghiem. THIS IS NOT A SUPPLEMENTAL TO THE MASTER PERMIT 17010-10000-01465 Lucas Museum. Scope: Deferred submittal for perimeter fence for Lucas Museum Project. · 2026-08-25
OUTDOOR LIGHTING FOR FENCING AREA ALONG THE FENCE BY BILL ROBINSON AVE AND SOUTH VERMONT AVE. · 2026-08-14
Floor drain with a trap primer and backflow device for new water feature. RE: 17010 - 20112 - 01465 · 2026-08-13
BACKFLOW DEVICE FOR YODA WATER FEATURE · 2026-08-12
*eplan* ATTENTION QUAN NHGIEM. Under construction, Lucas Museum. Supplemental to 25016-20000-04130. Scope: Deferred permit for Level 1 Overhead Inserts Shop Drawings and CalculationsNo change in permit valuation · 2026-08-10
Day 2 Bulletin #3 Back of House Additions · 2026-08-10
*eplan* Attn: Quan Nghiem. Scope: Lucas Museum Project. Interior TI build out of two security pavilions. Includes demo of a small wall for an opening for the ticket counter, power and data modifications for equipment, reconfiguration of light fixtures. Also includes Interior TI build out of two Green Rooms on Level 1. Scope includes removal of mirrors and cabinets, power modification for the new lighted mirrors. · 2026-08-07
New 200A disconnect, 75kVA xfmr, 250A panel, and branch circuits for (10) electric patio heaters. · 2026-08-07
Security Pavilion and Green Rooms - (N) Power and Lighting · 2026-08-05
Lucas Museum Project. Supplemental permit to adjust positioning of hanging cable assembly for museum art piece.No change in valuation · 2026-08-04
Install new backflow preventers and fixture connections for commercial kitchen. · 2026-08-04
DEFERRED SUBMITTAL FOR Construction of new main gate assemblies consisting of custom cast stainless-steel gates at either end of the plaza along Vermont Avenue and Bill Robertson Lane. · 2026-08-03
SUPPLEMENTAL TO PERMIT #26041-90000-22690 TO CHANGE ADDRESS FROM 2800 S VERMONT AVE TO NOW READ 3800 S VERMONT · 2026-07-31
*eplan* Attn: QUAN NGHIEM. Lucas Museum permit for tenant improvement to build out an existing cafe at Level 1. Scope includes new equipment, power and data modifications for equipment, as well as plumbing connections for equipment. Rework of existing countertop and millwork. · 2026-07-27
(N) YODA WATER FEATURE- EQUIPMENT, LIGHTS, BONDING · 2026-07-24
(1) (N) Panel S-1LC1M - 120/208v 3ph4w 100a · 2026-07-20
eplan Lucas Museum ProjectScope: Deferred permit for statue anchorage · 2026-07-17
Furnish and install grilles, transfer boots, and associated ductwork. Relocate thermostat. · 2026-07-08
Install grilles & ductwork, and one(1) VAV-box. Remove and relocate thermostat, and plenum. · 2026-07-06
Install (2) traction elevators: Elevators F1 & F2 · 2026-06-25
Install (3) traction elevator · 2026-06-25