Att Joe Vo: Supplemental to 24010-10000-02700. Update permit to remove Fire Sprinklers not required · 2026-09-09
Installation of Low Voltage CCTV, Card Access"COMPLY WITH DEPARTMENT ORDER effective date08/16/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-09-02
*EPLAN* NEW 1-STORY DETACHED GUARDHOUSE ASSOICATED WITH BUILDING UNDER SEPARATE PERMIT 24010-10000-02700. · 2026-09-02
*EPLAN* NEW 1-STORY DETACHED GUARDHOUSE AT SOUTH SIDE OF LOT ASSOICATED WITH BUILDING UNDER SEPARATE PERMIT 24010-10000-02700. · 2026-09-02
New HVAC System"COMPLY WITH DEPARTMENT ORDER effective date08/16/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-07-28
NEW PLUMBING PLAN CHECK FOR POTABLE WATER AND VOLUNTARY FOR WASTE/VENT. INCLUDES 1" WATER METER AND 1-1/2" BACKFLOW DEVICE. · 2026-07-27
SITE GRADING PERMIT FOR NEW 1-story commercial building (B24LA12359) · 2026-07-22
New trash enclosure. · 2026-07-01
Supplemental permit to 24010-10000-02700 for revisions to Voltera EV accessory budling. See narrative for changes. ADDITIONAL WORK TO INCLUDE: Restripe existing parking lot for new EV charging stalls with new EV equipment. · 2026-06-30
DELTA G CHANGES:NEW FEEDER AND 50KVA TRANSFORMER TO SUPPLY AN EXISTING CELL TOWER PANEL WITH EXISTING CIRCUITS · 2026-06-09
DELTA 7 REVISIONS TO PERMITTED SET OF PLANS:ADDED A 100A GENERATOR DOCKING STATION TO ONE OF ORIGINAL SWBD TO SUPPLY 75KVA XFMR/PNL-01 WHICH HAS TWO SUBPNELS EACH 60AW/ CKTS. ((((((([ePlanLA] Power only, Install (2) 5000A, 277/480V, 3ph, 4W, switchboard supply EV Chargers, and provide power to (31) EV chargers. AB 970 (2021) · 2026-06-09
24041-10001-33742
Verifications in Progress
Supplemental to 24041-10000-33742, multiple supplemental submitted at the same time, refer to 24041-10002-33742. Replace panel PP1 and update panel schedule for PNL01. Change of lighting and equipment in IT room and storage room. · 2025-09-16
(EPlan) Title 24 plan check for energy only. Scope of work includes new panel, lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 510 sf. · 2025-09-09
Install Site and canopy lighting, Site GFI receptacles, power to (2) gaurd houses, power to (2) gate operators and installation of low voltage conduits · 2025-08-28
24041-10002-33742
Quality Review Completed
Supplemental to 24041-10000-33742, multiple supplemental submitted at the same time, refer to 24041-10001-33742. Adding panel PP2 and PP3 and updating PNL01. Add Title 24 lighting. · 2025-08-19
[ePlanLA] Power only, Install (2) 5000A, 277/480V, 3ph, 4W, switchboard supply EV Chargers, and provide power to (31) EV chargers. AB 970 (2021) · 2025-06-11