Supplemental to permit # 22010-10000-03891 Structural sketch submitted as a result of inspection request for new 5-story, 43-Unit multi-family residential building w/ subterranean parking. SSK 10 Ground Floor Depression (1 sheet). No other changes to previously submitted plans. · 2026-09-03
22010-10004-03891
Verifications in Progress
notifeid jimmy 8/6 Attn: Zoning Plan Check - Supplemental to permit#: 22010-10000-03891 to capture architectural and structural changes for construction. ZONING PLAN CHECK ONLY FOR SUPPLEMENTAL PERMIT APPROVAL · 2026-09-01
*** 32 market rate & 11 affordable units ***FIRE SPRINKLER SYSTEM PER NFPA 13. 4" FIRE SERVICE METER AND 4" BFP. · 2026-09-01
22010-10002-03891
Verifications in Progress
Attn: Vu Nguyen - Supplemental to permit#: 22010-10000-03891 to capture architectural and structural changes for construction. · 2026-08-18
Supplemental to permit#: 22010-10000-03891Structural Sketches submitted as a result of inspection request for new 5-story, 43-unit multi-family residential building with subterranean parking. SSK 03 Non-load bearing concrete walls at basement SSK 04 New ramp beam (3 sheets)No other changes to previously submitted plans. · 2026-05-13
REVISION TO APPROVED PLANS. REVISIONS TO POTABLE WATER AND WASTE/VENT SYSTEMS. UPDATED RISERS AND POTABLE WATER DEMAND. ADDITION OF STORM DRAINAGE SYSTEM WITH SUMP PUMPS. · 2026-04-29
POTABLE WATER WITH BOOSTER PUMP AND WASTE/VENT. TWO 2" WATER METERS, 4" BACKFLOW PREVENTER. · 2026-04-27
[ePlan] Changes to approved set. Revised SLD, panel schedules, power and lighting floor plans. Added 25kW generator, 100A ATS, 225A sub panel. PC for clouded changes only. · 2026-04-15
24044-10001-01841
Quality Review Completed
*** Prev PC: Faud Malki ***REVISION TO PREVIOUSLY APPROVED PLAN UNDER 24044-10000-01841. REMOVED BOOSTER FANS AND ADDED A GENERATOR ROOM · 2026-01-20
NEW GENERAL HVAC WITH PRODUCT CONVEYING EXHAUST · 2025-11-24
[ePlan] Full PC for new 5-story 44-unit affordable housing apartment building. Scope includes new 2000A 208/120V 3PH 4W service, distribution boards, sub panels, EV chargers, power and lighting. Total affected area is 22815 sqft.B# 22010-10000-03891 · 2025-06-30