Permits at 3424 W WILSHIRE BLVD

5 permits on file · Los Angeles, CA · from the official municipal record

24044-10000-12778 Corrections Issued

HVAC TI. High rise building- includes stair pressurization and smoke control. · 2026-09-01

Put four (4) elevator(s) into construction-mode for attendant operation, install intercom system at each landing and inside the elevators, and use elevators while the building is under construction."COMPLY WITH DEPARTMENT ORDER effective date 06/10/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-06-08

24041-10000-33574 Ready to Issue

[eplan] Change of use from an existing 13 stories commercial office to joint living and work quarters(adaptive reuse) from ground floor to penthouse totaling 260 unis.Leasing office o& lobby on the ground floor; residential amenities on bsmnt level;outdoor residential amenity on 2nd floor. · 2026-06-05

NEW SPRINKLER SYSTEM FOR LIVE/WORK BUILDING. INCLUDE SPRINKLERS, STANDPIPES AND FIRE PUMP. · 2026-03-02

24042-10000-13812 PC Info Complete

POTABLE WATER WITH TRIPLEX BOOSTER PUMP, WASTE/VENT WITH SEWAGE EJECTOR, MEDIUM PRESSURE GAS. POTABLE WATER CONNECTS TO 6" DOMESTIC WATER METER AND 6" RP BACKFLOW PREVENTION DEVICE."COMPLY WITH DEPARTMENT ORDER effective date 06/10/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2025-08-21

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.