Permits at 340 S MAIN ST

12 permits on file · Los Angeles, CA · from the official municipal record

Remove and replace one(1) 8.5-Ton package unit with a 7.5-Ton unit. · 2026-08-31

INSTALL LOW VOLTAGE CABLING TO 1ST AND 2ND FLR. · 2026-08-24

25020-10000-01153 Permit Finaled

EPLAN Updating and adding on to the existing exterior security fence at North and East side of Building B. Fences range from 10FT to 11 FT. · 2026-06-25

Supplemental to 24016-10002-31835 to capture Fire Marshal clearance. · 2026-06-11

24016-10000-31835 Permit Finaled

eplan: Interior Office remodel of 3 levels of Google office. New non-structural partitions, ceiling, fixtures, finishes. Area of work 77,795 SF. No change of use. · 2026-05-26

24016-10001-31835 Permit Finaled

eplan,Supplemental to Permit 24016-10000-31835. Revise layout at first floor, second floor, and third floor; added 2HR rated frame and double wood doors between BIN1 and BIN2 buildings; added new exterior double doors(door 101) at Vestibule 101; added card readers. Update finishes and power data on 2nd and 3rd Floors. · 2026-05-26

25042-90000-18651 Permit Finaled

Commercial Cafe · 2026-05-22

25044-90000-11628 Permit Finaled

RENOVATION OF EXISTING COMMERCIAL CAFE LOCATED ON THE GROUND LEVEL. SCOPE INCLUDES SELECTED REMOVAL OF FINISHES, POWER, LIGHTING, AND SERVERY MILLWORK. RECONSTRUCTION OF MILLWORK, POWER AND FINISHES, FURNITURE / EQUIPMENT AND ASSOCIATED MEP IMPROVEMENTS. THERE IS NO CHANGE IN USE OR ADDITIONAL FLOOR AREA INCLUDED IN THIS APPLICATION · 2026-05-21

25044-90000-04726 Permit Finaled

COMMERCIAL TENANT IMPROVEMENT ON 3 FLOORS. SCOPE OF WORK INCLUDEPARTIAL DEMOLITION AND CONSTRUCTION OF NEW PARTITIONS, CEILINGS, FINISHES,AND FURNITURE / EQUIPMENT AND ASSOCIATED MEP IMPROVEMENTS. · 2026-05-19

25043-10001-02141 Permit Finaled

REVISION TO APPROVED PLANS UNDER 25043-10000-02141. REVISION TO ADD 1ST AND 2ND FLOOR SCOPE OF WORK. ADD AND RELOCATE SPRINKLER HEADS. · 2026-05-14

25043-10000-02254 Corrections Issued

FIRE SPRINKLER T.I. ADDING/ RELOCATING SPRINKLER HEADS. ***See the approved 3rd floor plan with hydraulic calculations allowing the use of braided flexible hose sprinkler connections for reference. · 2025-05-16

Plan check for fire spirnkler system. · 2025-05-14

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.