Remove and replace one(1) 8.5-Ton package unit with a 7.5-Ton unit. · 2026-08-31
INSTALL LOW VOLTAGE CABLING TO 1ST AND 2ND FLR. · 2026-08-24
EPLAN Updating and adding on to the existing exterior security fence at North and East side of Building B. Fences range from 10FT to 11 FT. · 2026-06-25
Supplemental to 24016-10002-31835 to capture Fire Marshal clearance. · 2026-06-11
eplan: Interior Office remodel of 3 levels of Google office. New non-structural partitions, ceiling, fixtures, finishes. Area of work 77,795 SF. No change of use. · 2026-05-26
eplan,Supplemental to Permit 24016-10000-31835. Revise layout at first floor, second floor, and third floor; added 2HR rated frame and double wood doors between BIN1 and BIN2 buildings; added new exterior double doors(door 101) at Vestibule 101; added card readers. Update finishes and power data on 2nd and 3rd Floors. · 2026-05-26
Commercial Cafe · 2026-05-22
RENOVATION OF EXISTING COMMERCIAL CAFE LOCATED ON THE GROUND LEVEL. SCOPE INCLUDES SELECTED REMOVAL OF FINISHES, POWER, LIGHTING, AND SERVERY MILLWORK. RECONSTRUCTION OF MILLWORK, POWER AND FINISHES, FURNITURE / EQUIPMENT AND ASSOCIATED MEP IMPROVEMENTS. THERE IS NO CHANGE IN USE OR ADDITIONAL FLOOR AREA INCLUDED IN THIS APPLICATION · 2026-05-21
COMMERCIAL TENANT IMPROVEMENT ON 3 FLOORS. SCOPE OF WORK INCLUDEPARTIAL DEMOLITION AND CONSTRUCTION OF NEW PARTITIONS, CEILINGS, FINISHES,AND FURNITURE / EQUIPMENT AND ASSOCIATED MEP IMPROVEMENTS. · 2026-05-19
REVISION TO APPROVED PLANS UNDER 25043-10000-02141. REVISION TO ADD 1ST AND 2ND FLOOR SCOPE OF WORK. ADD AND RELOCATE SPRINKLER HEADS. · 2026-05-14
25043-10000-02254
Corrections Issued
FIRE SPRINKLER T.I. ADDING/ RELOCATING SPRINKLER HEADS. ***See the approved 3rd floor plan with hydraulic calculations allowing the use of braided flexible hose sprinkler connections for reference. · 2025-05-16
Plan check for fire spirnkler system. · 2025-05-14