26043-10000-04188
Submitted for Quality Review
*** 100% AFFORDABLE HOUSING ***FIRE SPRINKLER T.I. ADDITION OF SPRINKLER HEADS TO (E) NFPA 13 SYSTEM IN (E) HIGH RISE BUILDING. INCLUDES STANDPIPE SYSTEMS AND FIRE PUMP. (E) 8" FIRE METER, 8" BACKFLOW DEVICE.**** Change of use & renovation of (E) 13 story type I-A office building concourse and tower over two level of subterranean parking garage to 463 Joint Living & Working Quarters & New occupied roof deck amenity at concourse roof level, including seismic retrofit Per Division 95 .( Adaptiv · 2026-09-11
23042-10001-26276
Verifications in Progress
REVISION TO PREVIOUSLY APPROVED PLUMBING PLANS UNDER APPLICATION # 23042-10000-26276. REVISION TO THE POTABLE WATER WITH BOOSTER PUMP, WASTE AND VENT, AND MEDIUM PRESSURE GAS. 8 INCH WATER METER WITH (2) 6 INCHRP BACKFLOW DEVICES IN PARALLEL · 2026-09-10
23016-10007-18578
Verifications in Progress
Ch1A - EPLAN ****Plan check onlySupplemental to Permit# 23016-10000-18578 to convert the approved market-rate units to 100% affordable housing and increase the total unit number from 463 units to 512. Removal of amenity spaces on the concourse level. PROJECT UTILIZING:Sec. 9.4.5. Downtown Adaptive Reuse ProgramAB2097100% AFFORDABLE HOUSING (41ELI, 8%)see below scope of work under original permit application # 23016-10000-18578 Change of use & renovation of (E) 13 story type I-A office building · 2026-08-17
24041-10001-04014
Quality Review Completed
UPDATE HIGH-RISE MIXED USE RESIDENTIAL -3 CONCOURSE LEVELS & 8 STORY TOWER BUILDING WITH 492 RESIDENTIAL UNITS to 517 UNITS. UPDATE LIGHTING PLANS, POWER PLANS, TITLE 24 CALCULATIONS, AND EMERGENCY EGRESS LIGHTING PHOTOMETRIC CALCULATIONS ACCORDINGLY. · 2026-07-20
24044-10000-02744
Corrections Issued
GENERAL HVAC WITH GARAGE VENTILATION. INCLUDES SMOKE CONTROL AND STAIRWELL PRESSURIZATION.*** Renovation of existing commercial office concourse and tower to 467 live-work units, including seismic retrofit under Ordinance No. 174315 Downtown Adaptive Reuse Project. New occupied roof deck amenity at concourse roof level. Renovation of ground level parking (P1) to residential amenities. All other existing parking levels to remain.**** · 2026-06-04