25010-10001-03927
Verifications in Progress
***100%PDPP. (25%PDPP FOR ZONING REVIEW ONLY UNDER 25010-10000-03927, B25LA36016).*** The proposed project includes demolition of the existing building and removal of the employee parking on the southern portion of the site. In its place, a new seven-story high-rise office building with one basement level will be constructed, totaling approximately 87,332 SF of gross floor area. The new building will provide office and consulate services. Two levels of structured employee parking will be locate · 2026-08-27
26020-10000-00634
Verifications in Progress
Shoring plan for a new 7-story, 87,400 SF office/consulate building with one basement and two levels of structured parking (60 spaces) will be built. The north portion will remain surface parking with 96 visitor spaces. Building height is 105-7 (LABC) and 122-3 (LAMC). · 2026-08-19
26044-10000-02668
Corrections Issued
GENERAL HVAC AND SMOKE CONTROL FOR EXISTING HIGH RISE BUILDING. INCLUDES STAIRWELL PRESSURIZATION. ** VERIFY GARAGE VENTILATION. *** · 2026-08-07
26041-10000-05425
Corrections Issued
(Eplan) Full plan check. Furnish and install new equipment for power distribution system, new power distribution system, and new lighting fixtures with control system in compliance with code. Provide all required testing and commissioning to all newly installed electrical systems for all conformances of design intentions and code regulations. Provide start up to all installed electrical systems and provide necessary training to ownership for proper operation and regular maintenance of systems. T · 2026-08-05
26042-10000-03475
Corrections Issued
PLUMBING TI. POTABLE WATER, WASTE/VENT, STORM DRAINAGE, AND SEWAGE EJECTOR SYSTEM. 3" WATER METER AND 3" BFP · 2026-07-30