Provide electrical power, conduit pathways, wiring, and control/communication wiring for the CO System. 120V power for the control system and 120/24V transformer; wiring between the 301C control panel, relay module, jet fan contacts, CO sensor, strobe/horn alarm, and maintenance strobe. (1) Control Panel, (5) CO Sensors, (1) Relay, and Alarm System · 2026-09-04
[E-PLAN] Roof-mounted solar PV system.System size: 116.6KW DC, 90.075KW AC(212) 550W modules(3) 30KW AC Inverters(6) 40.96KW AC ESS units(1) 400A combiner box(1) 400A PV panel · 2026-08-06
24044-20001-05429
Corrections Issued
+++Attn: Nick+++Supplemental permit for previously approved HVAC work for 7 story mixed use commercial residential building. · 2026-07-23
Installation of two cabled electric elevators. · 2026-04-20
(EPlan) Installation of fire alarm system. Scope of work includes 1 FACP and 724 FA devices. · 2026-01-15
General HVAC, heating and cooling. product conveying. · 2025-06-03
+++AFFORDABLE HOUSING++++ New 7 store apartment building with 4" meter, 4" backflow and 4 way FDC per 2022 NFPA 13 · 2025-05-19
[ePlan] Changes to approved plan. New 600A distribution board added. Updated feeder size and load summary for RDB1 and RDB2. Relocation of residential distribution board to upper levels from main electrical room. Updated distribution plan and electrical room layout. Added circuits for unit panels. · 2025-04-08