Permits at 3020 W WILSHIRE BLVD

14 permits on file · Los Angeles, CA · from the official municipal record

26048-10000-01354 Ready to Issue

eplan - 3 new illuminated wall signsSIGN A: LED illuminated Channel letter 28" x 28'-7" = 66.7 SQ FT, 84' from grade "THE BORA 3020"SIGN B: LED illuminated Channel letter 42" x 25'-3" = 88.4 SQ FT, 12' from grade "THE BORA 3020"SIGN D: LED illuminated Channel letter 24" x 7'-6.5"= 15.1 SQ FT, 14' from grade "3020" · 2026-09-11

26045-10000-00398 Permit Finaled

4- Hot Water Storage Tanks and 4-Domestic Hot Water Boilers · 2026-09-10

eplan - new illuminated projecting sign 24" x 24" = 4 SQ FT, 10'- 3" from grade "P" · 2026-09-08

26041-10000-34845 Permit Finaled

Installation of 24 new EV chargers serviced by existing EV panel.Total load not to exceed 400 amps · 2026-08-28

Installation of 40 new EV chargers serviced by existing EV panel.Total load not to exceed 400 amps · 2026-08-26

Installation of 40 new EV chargers serviced by existing EV panel.Total load not to exceed 400 amps · 2026-08-26

26043-10000-03747 PC Approved

PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS 24043-10000-04789. Revising the size of the fire service on the standpipe isometric diagram to 6" fire meter, 6" backflow. · 2026-08-05

22020-10001-02233 Permit Finaled

*eplan* Atth: Quan Nghiem. Supplemental to permit# 22020-10000-02233 for raker system to cantilever pile (solder pile # 23- 37 ) and south and some of west side solder pile location are inside the property line · 2026-06-30

22020-10000-02233 Permit Finaled

EPLAN SHORING for NEW 8-STORY 262 UNITS MIXED USE BUILDING TO INCLUDE 6 LEVELS OF TYPE IIIA APARTMENT OVER 2-STORY TYPE IA PARKING/RETAIL OVER 1 LEVEL SUBTERRANEAN PARKING TO INCLUDE RACKER AND TIEBACKS · 2026-06-30

*eplan* Attn: QUAN NGHIEM. Supplemental permit to 22010-10000-00491 to replace mechanical room with Fire Pump Room at Level P1 · 2026-06-24

Revision to Previously Approved Plans: 22042 - 10001 - 18126. Revision to Medium Pressure Gas System. · 2026-06-18

Installation of (4) Cabled Elevators · 2026-01-23

PLUMBING FOR NEW POOL & SPA. · 2025-06-23

Temporary service for construction, new service switchboard transformers & panel · 2025-03-26

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.