*EPLAN* Email 08/25/26 (Attn: Vu Nguyen /Scrn: Eugene Barbeau)Add piles to shoring · 2026-09-10
22044-10001-05186
Corrections Issued
**OG PC IS CRISTINA***REVISIONS TO PREVIOUSLY APPROVED PLAN. ADDING NEW AC UNITS INCLUDING A2L REFIGERANT AND REVISE DUCTWORK LAYOUT**NOTE TO PC: UPDATED T24 IS PROVIDED IN A SEPARATE FILE** · 2026-08-27
[EPLAN] SUPPLEMENTAL PLAN CHECK FOR CHANGES TO APPROVED SET. CLOUDED CHANGES ONLY. CHANGES MADE TO SINGLE LINE DIAGRAM FEEDDER INFORMATION, CALCULATIONS,, PANEL SCHEDULES, LIGHTING FLOOR PLAN, AND POWER FLOOR PLAN AND EGRESS PHOTOMETRICS. NEW LOADS. · 2026-08-17
22016-10002-12328
Quality Review Completed
Attn: Vu Nguyen*** Supplemental to permit 22016-10000-12328 / 22016-10001-12328.Eplan: Revisions include: new structural columns, relocated and revised equipment, updated egress plan, revised exterior stairs, slab revisions, updated door and window schedule, ceiling revisions, revised connection details · 2026-07-08
REVISIONS TO PREVIOUSLY APPROVED PLANS UNDER 22042-10001-09287. UPDATES TO POTABLE WATER FIXTURES AND PIPE SIZE CHANGE & WASTE/VENT SYSTEMS. · 2026-07-07
GENERAL HVAC AND (8) TYPE 1 HOODS · 2026-04-29
REVISIONS TO PREVIOUSLY APPROVED PLANS UNDER 22042-10000-09287. UPDATES TO POTABLE WATER, WASTE/VENT, AND MEDIUM PRESSURE GAS SYSTEMS. · 2026-04-15
Plan check for fire sprinkelr system. This is a NFPA 13 system. 4-inch fire service. · 2025-11-17
[ePlan] Plan check for power and energy compliance for commercial building TI - food commisary. Scope of work includes new 2000A 208/120V 3ph 4W service, new sub panels, lighting, controls, and receptacles. Total affected area is 17517sq.ft. · 2025-06-24
PLAN CHECK FOR POTABLE WATER WITH BOOSTER PUMP, WASTE/VENT AND MEDIUM PRESSURE GAS. INCLUDES 1 1/2" WATER METER, 1 1/2" BACKFLOW. · 2025-06-23