NFPA 13 FIRE SPRINKLER & STANDPIPE SYSTEM. 4" FIRE METER WITH BACKFLOW PREVENTER. · 2026-08-28
see narrative of changes. · 2026-08-27
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLAN UNDER 25042-10000-02385. REMOVE SEWAGE EJECTOR. · 2026-07-13
****ORIGINAL PLAN CHECKER: MIKE****REVISION TO PREVIOUSLY APPROVED PLANS. CHANGE TO A2L EQUIPMENT AND ADDITION OF EQUIPMENT***** 1.M1.0:Revised Fan coil and Heat pump condensing unit schedules based on changed refrigerant from R-410a to R-32.Added R32-Refrigerant Concentration Calculation Schedules 2.M2.1:Relocated HP-1 from roof to first floor.3.M2.6:Removed HP-1 from roof and provided on first floor.4.M 4.0 &4.1 &4.2 &4.3 &4.4:Revised Title 24 based on revised equipment with new refrigerant . · 2026-06-02
Plan check for heating, venting, air conditioning and garage exhaust systems. · 2026-05-18
POTABLE WATER, WASTE/VENT WITH DUPLEX SEWAGE EJECTOR, AND STORMWATER WITH DUPLEX SUMP PUMP. 2-INCH DOMESTIC WATER METER WITH 3-INCH RP BACKFLOW PREVENTER. · 2026-05-06
[EPLAN] FULL PC. COMPLETE ELECTRICAL DESIGN OF NEW 5-STORY 14-UNIT AFFORDABLE HOUSING APARTMENT BUILDING. NEW 800A 120/240V 3PH 4W SERVICE, SUB PANELS, POWER AND LIGHTING LOADS. TOTAL AFFECTED AREA IS 8174 SQFT.B #23010-10000-02741 · 2026-02-26