LAX APM - Sewer cap permit to comply with LADBS Inspection Correction Notice (Violation No. 21-RWP-152-Q-2618) at Bent 4-SW5, related to CTA Center Station plumbing (permit 19042-10000-02908) · 2026-09-10
Make changes to the previously approved plan. Plan check only. Permit fees paid under 19042-10000-02908. · 2026-09-04
LAX: Alteration of existing LAX parking structure P2B. Includes exterior facade improvements, framing alteration, parking/striping alteration, and installation of electric vehicle charging stations. · 2026-08-26
PLAN CHECK FOR FOUR CABLED ELEVATORS. · 2026-08-04
Installation of six (6) new ESCALATORS · 2026-08-04
**ePlan**LAX APM**Project Under Construction**Supplemental to CCTA (18010-10000-04881) for beam strengthening fiber wrap at GVC P6 due to field revision · 2026-06-18
**LAX APM** GRADING FOR TEMPORARY SHORING FOR CTA CENTER STATION ESCALATOR FOUNDATIONS AND P6/P2A/P2B PEDSTRIAN WALKWAY GARAGE VERTICAL CORE FOUNDATIONS (T5.5, T2.0, T2.5). TOTAL CUT 931 CY, TOTAL FILL 158 CY. 2 OF 2. · 2026-06-18
**LAX APM** SUPPLEMENTAL GRADING TO PERMIT# 20030-10000-06465 TO INCREASE GRADING QUANTITIES TO REFLECT CHANGES TO SHORING DESIGN FOR CCTA GARAGE VERTICAL CORES (GVCs) UNDER SHORING SUPPLEMENTAL PERMIT# 20020-10001-02374. REVISED GRADING QUANTITIES TO BE THE FOLLOWING: 1119 CY TOTAL CUT AND 628 CY TOTAL FILL. 0 CY IMPORT AND 491 CY EXPORT. CHANGE OF ENGINEER OF RECORD. 2 OF 2 · 2026-06-18
Installation of 8 moving walks. · 2026-05-19
SUPPLEMENTAL TO 19043-10000-05956 TO CHANGE ADDRESS FROM 1 W WORLD WAY TO 251 W CENTER WAY. · 2026-04-28
Revision to approved added (5) Sprinklers and a riser · 2026-03-24
LAX APM. Site utilities fire water piping for future CTA Center Station (CCTA) fire suppression system. · 2025-12-23
Plan check Fire Sprinkler System. · 2025-12-23
Install Wet standpipe with Fire Hose Valves per level of a newly constructed stairwell · 2025-12-23
PLAN CHECK FOR NEW CABLE ELEVATORS. · 2025-11-25
LAX-APM Attn Francis YsaguirreExpediteSupplemental to CCTA Electrical (19041-10000-04478) for electrical updates. · 2025-05-31
Attn: Francis YsaguirreLAX-APM-ExpediteDelta 1 changesSupplemental to P2B Electrical Permit (19041-10000-15362) Scope includes the installation of new 16kVA 3 Phase Inverter, 480/277V Input-480/277V Output at P2B Parking Structure at LAX.Original 1PH inverter changed to a 3ph and update the homeruns of the 6 lighting circuits from the inverter. Lighting fixtures remained the same. · 2025-04-25