(EPlan) Revision to 25041-10001-10697. Delta 15.Revised Single Line Diagram based on RFI 232 or Elevator Transformer and Disconnect SwitchClarification RFI. Replaced fixture type E5 with fixture type E5 ALT2. Replaced fixture types E3B and E3C with E3D. Changed lighting circuit based on RFI 300 or Emergency Egress Lighting RFI. Added new circuit to 1LP. · 2026-08-28
REVISION TO APPROVED PLANS UNDER 24042-10000-14280. ADDED BALANCING VALVE TO POTABLE WATER RISER. ADDED SPRINKLER HUB DRAIN TO WASTE RISER WITH REVISED SE CALCULATIONS. · 2026-05-04
INSTALLATION OF ONE NEW HYDRAULIC ELEVATOR. · 2026-01-15
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #25043-10000-00951. UPDATED PIPING LAYOUT AND ADDED SPRINKLER HEADS PER INSPECTION REQUEST. UPDATED SWAY BRACING. · 2025-12-23
Supplemental to permit 25041-10000-10697. Revised lighting fixture schedule, Revised Title 24 forms, Revised lighting plan and Revised panel schedule. Delta 8. · 2025-11-25
INSTALLATION OF THREE SUMP PUMPS (1X SITE AND 2X STAIRCASE) · 2025-11-11
25042-10000-19099
PC Info Complete
SITE POTABLE WATER. 3" DOMESTIC WATER METER WITH BACKFLOW DEVICE. · 2025-11-03
[E-PLAN] INSTALLATION OF A NEW iO1000R FIRE ALARM PANEL TO THE HISTORICAL BUILDING LOCATED ON FIRST FLOOR [STREET LEVEL] BY THE MAIN ENTRANCE, · 2025-07-22
E-PLAN, THE EXISTING 2-STORY BUILDING WITH A BASEMENT WILL BE RENOVATED AS A GATHERING/EVENT SPACE AND OFFICES. ELECTRICAL SERVICE FOR THE BUILDING UPGRADED 800A MAIN BUS, 120/240V-3PH-4W, NEW DISTRIBUTION EQUIPEMNT, RECEPTACLES ANDLIGHTING PROVIDED. PLAN CHECK FOR POWER AND ENERGY. · 2025-05-22
PLUMBING T.I. INCLUDES POTABLE WATER SYSTEM AND WASTE & VENT WITH DUPLEX SEWAGE EJECTOR SYSTEM. 3'' DOMESTIC WATER METER; 3'' BACKFLOW PREVENTER. · 2025-05-06
NFPA 13 Fire Sprinkler System. 4" Fire Service 4" Backflow · 2025-04-22
HVAC T.I. GENERAL HVAC INCLUDES ADDING RTUs, VRF SYSTEM, AND ENVIRONMENTAL EXHAUST. * · 2025-04-07
24041-10000-34598
Corrections Issued
[ePlanLA] Power and Energy, 800A, 120/208V, 3ph, 4W, 1 Elevator(30HP), new lighting and power, Total lighting area: 17,144 sq ft. The electrical service for the building will be upgraded, and new distribution equipment and lighting will be provided. the newly renovated space will be provided with receptacles and lighting controls to meet the programming needs. · 2025-03-28