Run New Plumbing for new cafe · 2026-09-09
Ventilation system for utility room, and supply air for prep room with heater. · 2026-09-02
26041-10000-27103
Quality Review Completed
EPLANPORT OF LA PV INSTALLATION. INTERCONNECTED TO BARGEPV SIZE 506.1 KW DC 468.4 KW AC 823 PV MODULES INSTALLATION OF A ROOF-MOUNTED COMMERCIAL SOLAR PHOTOVOLTAIC (PV) SYSTEM. THE PV SYSTEM SHALL BE INTERCONNECTED WITH THE ELECTRICAL UTILITY GRID IN ACCORDANCE WITH THE REQUIREMENTS OF THE LOS ANGELES DEPARTMENT OF WATER AND POWER (LADWP), THE CALIFORNIA ELECTRICAL CODE (CEC), AND ALL OTHER APPLICABLE LOCAL, STATE, AND UTILITY REGULATIONS.THE PROJECT ALSO INCLUDES THE INSTALLATION OF A NEW ELECT · 2026-07-30
HVAC TI WITH (2) FUME HOODS AND A2L REFRIGERANT. · 2026-02-26
25041-10000-34757
Corrections Issued
(EPlan) Title 24 plan check for energy and power. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 8366 sf. · 2026-01-08
25044-10000-08442
Corrections Issued
GENERAL HVAC T.I. **PC TO ADD CLEARANCE FROM POLA ON PCIS**** · 2025-12-29
TENANT IMPROVEMNT. ADDITION OF SPRINKLER HEADS TO AN (E) NFPA 13 SYSTEM. · 2025-09-12
[ePlan] Power and energy plan check. Scope is to add (3) 1-story B occupancy buildings inside of existing warehouse at Berth 58. New 600A sub panel to supply (3) downstream sub panels and loads. · 2025-06-18