CONVERT (10) TEN RECREATION ROOMS IN EXISTING 6-STORY (TYPE IIIA OVER TYPE IA CONSTRUCTION) 40 UNIT APARTMENT BUILDING INTO ACCESSORY DWELLING UNITS (ADUs) PER GCS 65852.2(e)(1)(C), EQUIPPED WITH NFPA 13 FIRE SPRINKLERS. · 2026-09-10
[eplan] Subpanels, power, and lighting for conversion of recreation rooms to ADUs in existing apartment building. Plan check for power. Note to plan reviewer: Associated building permit 24016-30000-08148 cannot be issued until CofO has been granted to main building under 22010-30000-06093. This electrical permit shall also not be issued until CofO issued for building.Added Unit/ADU info, per Inspector's request.UNIT 104: ADU # 1UNIT 202: ADU # 2UNIT 203: ADU # 3UNIT 303: ADU # 4UNIT 305: ADU · 2026-09-04
Install low frenquency device for ADU's. Reference permit #24041-10000-41928 · 2026-08-28
PLUMBING T.I. - POTABLE WATER AND WASTE/VENT ADDITIONS DUE TO TEN (10) NEW ADUS. ***NOTE TO PC: ORIGINAL APPROVAL FOR BUILDING UNDER 22042-10000-28118. BUILDING PERMIT FOR ADU CONVERSION IS 24016-30000-08418.******* · 2026-08-27
26041-10000-28212
Quality Review Completed
(EPlan) PV2 for installation of roof mounted solar panels on commercial building. PV system includes 56 modules and 1 central inverter system connected to existing 600A main service panel. System size is 36.96kW DC/30.0kW AC. · 2026-07-20
GENERAL HVAC AND GARAGE VENTILATION. · 2026-06-22
HVAC T.I. GENERAL HVAC INCLUDES KITCHEN AND LAUNDRY EXHAUST. · 2026-06-18
[eplan] 1600A 208Y/120V 3ph-4w service, distribution, power, and lighting for new apartment building. Plan check for power and energy. · 2026-06-18
NEW PLUMBING SYSTEM. WORK INCLUDES WATER, WASTE & VENT WITH SEWAGE EJECTOR. · 2026-06-17
PLUMBING INCLUDE STORM DRAINAGE, SUBSURFACE DRAINAGE AND DUPLEX SUMP PUMP***Low income apartment*** · 2026-06-17
Low Voltage for entire system cable drop and panels and Adding motor (3), outlet (3) and switch (3) for automatic blinds for units 101,102,103 · 2026-06-17
SUPPLEMENTAL PERMIT TO CORRECT WORK DESCRIPTION FROM "DRAINS" TO "EARTHQUAKE GAS SHUT OFF VALVE" AND ADD BACK FLOW DEVICE. · 2026-06-17
Revision to approved plan to change the boiler manufacturer add bathtub and clothes washer and revise risers. Potable water and waste/vent. · 2026-06-17
Install Emergency Responder Radio System · 2026-06-12
NEW NFPA 13 SPRINKLER SYSTEM WITH MANUAL STANDPIPES AND WATER CURTAIN HEADS. 4-INCH FIRE METER WITH 4-INCH DOUBLE CHECK DETECTOR BACKFLOW PREVENTER. · 2026-06-11
grading for a new Apartment Building. *** 2 of 3 *** · 2026-06-11
2 new retaining walls · 2026-06-08
50 Unit apartments plumbing boilers/storage tanks · 2026-06-05
TEMP SERVICE AND TEMP PANEL 400AMPS · 2026-06-04
Install Two Way Communication system · 2026-06-03
NEW CABLED ELEVATOR · 2026-05-29
[EPLAN] INSTALLATION OF NEW AUTOMATIC FIRE ALARM SYSTEM FOR A NEW 6-STORY 40-UNIT APARTMENT BUILDING. (1) FACP, (3) REMOTE POWER SUPPLIES, AND (211) FA DEVICES. · 2026-04-24
[EPLAN] SUPPLEMENTAL PLAN CHECK ONLY FOR CHANGES TO APPROVED SET. CLOUDED CHANGES ONLY. SERVICE EQUIPMENT CHANGED, EQUIPMENT MANUFACTURE CHANGED TO EATON, LIGHTING FOR GYM CHANGED. · 2026-02-21
ePlan. Plan check only. Changes to an approved set. Wireway added for service equipment, elevation, and site plan. changes are in delta A. changes made to series rated breaker type. Original permit under 24041-10000-41928 · 2026-01-21