17 permits on file · Los Angeles, CA · from the official municipal record

SUPPLEMENTAL TO 21010-10001-03136 TO CAPTURE REVISION TO EGRESS ROUTE ** UNDER CONSTRUCTION · 2026-09-10

EPLAN: New 18'-11"x35'-5" Vault Supported Shotcrete Pool(Level per LA City Standard Plan#268 and Additional Engineering Details · 2026-09-09

DEFERRED SUBMITTAL TO 21010-10000-03136THIS SCOPE OF WORK INCLUDES THE DESIGN LAYOUT OF A NEW EXTERIOR BUILDING MAINTENANCE SYSTEM AND EQUIPMENT. SCHEDULED MAINTENANCE WINDOW CLEANING WILL BE PERFORMED USING AN F-TYPE CONTRACTOR PROVIDED POWERED BASKET SUSPENDED FROM A SYSTEM OF PORTABLE OUTRIGGER BEAM ASSEMBLIES, GROUND BASED CLEANING USING EXTENSION TOOLS, AND OPERABLE WINDOWS TO BE CLEANED FORM THEINTERIOR. THE SAFETY TIE-BACK ANCHORS SHALL BE USED FOR TIE-BACK OF UNSCHEDULED MAINTENANCE CONT · 2026-07-09

25041-40001-37302 Permit Closed

SUPPLEMENTAL PERMIT TO 25041-10000-37302 FOR A MISCELLANEOUS PERMIT.Fire Alarm conduit and boxes · 2026-06-17

25041-10000-37302 Permit Closed

Fire Alarm conduit and boxes · 2026-06-17

25041-10000-37303 Permit Closed

DAS System conduit and boxes · 2026-06-16

25041-10000-37299 Permit Closed

Low voltage system conduit and boxes · 2026-06-16

SUPPLEMENTAL TO 21010-10000-03136 - Revisions to Unit Balcony Glass Railing · 2026-06-16

[E-Plan] New Fire Alarm system consisting of (1) FACP, (1) Communicator, (1) Annunciator, (8) power supply panels and 582 devices. PROVIDE A FULLY FUNCTIONAL FIRE ALARM SYSTEM AS REQUIRED BY APPLICABLE CODES AND STANDARDS TO A NEW BUILDING · 2026-06-10

[ePlan] Changes to permit 23041-10000-67661. Delta 6 clouded. Upgraded transformers T1, T2, T3, T4 to 500KVA and T5, T6 to 750KVA, Updated FLA, breaker, feeder for Booster Pump BP-1, Updated voltage drop & AIC calculation. Added power for instahot in trash room, revised lighting. · 2026-06-03

INSTALLATION OF 3 CABLED ELECTRIC ELEVATORS. · 2026-03-25

GENERAL HVAC AND GARAGE VENTILATION. · 2026-02-18

REVISION TO PREVIOUSLY APPROVED PLANS UNDER #23042-10000-20878. UPDATED FIXTURES AND FIXTURE UNIT COUNT. REVISED POTABLE WATER, WASTE&VENT, AND STORM DRAINAGE RISER DIAGRAMS. UPDATED SEWAGE EJECTOR AND SUMP PUMP SYSTEM CALCULATIONS. NO CHANGE TO HYDRAULIC CALCULATIONS · 2026-02-04

25043-10001-02977 PC Approved

++PREV PC: CAMILLE ABEYTA++PLAN CHECK ONLY. REVISIONS TO PREVIOUSLY APPROVED PLANS UNDER 25043-10000-02977. ADDITION OF SEISMIC BRACING CALCULATIONS APPROVED BY THE BUILDING DEPARTMENT TO BE ADDED TO CURRENT SPRINKLER PERMIT SET. · 2025-11-13

NEW FIRE SPRINKLER SYSTEM PER NFPA 13 WITH STANDPIPE. 6'' FIRE METER AND 6'' BFP · 2025-08-14

[ePlan] Power plan check for temporary power. Scope of work includes the installation of a new 800A 480/277V 3PH 4W switchboard, (3) 75kVA XFMRs, multiple fusible disconnects, and (3) sub panels. · 2025-07-31

POTABLE WATER WITH BOOSTER PUMP, WASTE/VENT WITH SEWAGE EJECTOR, RAINWATER WITH SUMP PUMP, MEDIUM PRESSURE GAS. 6" WATER METER, 6" BACKFLOW PREVENTER · 2025-06-13