INSTALL THE PIPING FOR PRESSURE VESSELS RELATED TO THE INSTALLATION OF TWO NEW COMPRESSORS · 2026-09-09
New Mens restroom and replace existing plumbing fixtures on existing rough plumbing · 2026-08-31
CHANGE OF USE FROM S-1 STORAGE TO F-1 FACTORY INDUSTRIAL AND EQUIPMENT ANCHORAGE. · 2026-08-28
(2) Air tanks · 2026-07-30
26041-10000-30152
PC Info Complete
T-24 plan check emergency lighting plan check 47,442 · 2026-07-28
RUNNING CONDUITS AND STRAPING THE DUCTING BELOW CEILING AND CONNECT IT THROUGH THE DOOR · 2026-07-24
TI: A2L HVAC SYSTEMS. · 2026-06-15
EXTERIOR ALTERATION FOR NEW ROOFTOP MECHANICAL UNITS, ANCHORAGE AND FRAMING. · 2026-06-03
(EPlan) Revision to permit 26041-10000-06665.Panel schedules for panels L6A and L6B have been revised to show additional loads.Added two receptacles at column in Warehouse.Added controlled receptacle to Office 107.Added two dedicated circuits for microwave oven appliances in Break Room 109.Delta 2 clouded. · 2026-05-19
Installation of Low Voltage telephone, data, security systems and cables. · 2026-05-18
Relocate 50 fire sprinkler heads, 1 to 1 with existing 2 to 1 conditions. DW26-152 Office TI Phase 2 · 2026-04-27
New rough plumbing and fixtures to two Mezzanine sinks at North warehouse. · 2026-04-22
(EPlan) Full power plan check for a commercial building. Scope of work consists of new 1600A service, new panels, transformeres, receptacles and lighting fixtures.Total area affected: 15,000 SF Upgrade existing electrical service from 800A to 1600A, 480/277, 3 Phase, 4 WireInstall new exterior utility pull sectionInstall new utility meter section, 1600 Amp main circuit breaker, and 1600 Amp switchboard inside the buildingInstall customer-owned conduit and conductors from exterior utility pull se · 2026-04-03