25041-10001-52921
Quality Review Completed
Supplemental Permit to E25LA47444See attached narrative · 2026-09-01
Plan check only. Revision to potable water, waste/vent, and gas. · 2026-08-29
25044-20001-12215
Corrections Issued
***Jeremiah** Plan Check Only. supplemental permit to permit # 25044-20000-12215 · 2026-08-28
25016-20001-34406
PC Info Complete
Supplemental to 25016-20000-34406- Revise restroom layout for tenant improvement. Non structural · 2026-08-26
ADD WIRING AND EXTEND CONDUITS FOR INSTALLING (6) 40 AMP CAR CHARGER STATION IN SECOND FLOOR PARKING GARAGE FROM EXISTING BREAKERS IN PANEL EV FOR FUTURE CAR CHARGERS · 2026-08-12
CHANG EOF USE FROM OFFICES ON 1st AND 2nd FLOOR OF EXISTING MIXED USE BUILDING, INTO AN AMUSEMENT ENTERPRISE WITH RESTAURANT, DINING AREA, SHOOTING GALLERY, LASER TAG, VIDEO ARCADE AND GO-KART TRACK. · 2026-06-04
Plan check for potable water, gas, waste and vent systems. · 2026-06-04
GENERAL HVAC WITH (2) TYPE I HOODS. · 2026-06-04
(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 22816 sf. · 2026-04-10
Install one (1) new electric cabeled elevator. · 2025-10-17
Install four (4) new elevators · 2025-10-14
Plan check only. Correct Rated Speed on worksheet for elevator 5. · 2025-09-12
ONE NEW COMMERCIAL SWIMMING POOL AND ONE NEW SPA. · 2025-07-25
Install new plumbing system including potable water system, waste/vent, medium pressure gas system, sewage ejector, sump pump, and storm drainage system. One 4" water meter with 4" RP backflow device, and one 6" water meter with 6" RP backflow device. · 2025-07-25
Add 3 backflows to pool. · 2025-07-24
new hvac, heating and cooling. garage ventilation. · 2025-07-11
REVISION TO APPROVED PLANS; ADDITION OF STORM WATER DRAINS. · 2025-06-16
Supplemental PC to original PCIS 21042-20000-19804 added trap primers to riser diagrams, removed gas from plans for omitted gas, added drains. · 2025-06-16
new 2'' domestic usage water meter. 2 1/2 reduced pressure principle backflow device and PRV. · 2025-06-16
Supplemental PC Review - Original PCIS 21042-20000-19804- Changes include roof receptors changes, overflow drain changes, and added shower that was missing from riser diagram. · 2025-06-16
[eplan] Supplemental PC plan check original PCIS 21141-20000-19208- Reduced inverter INV-L size from 45kVA to 40kVA, added new 2kVA inverter IN with associated circuitry, deleted loads for circuits 13 and 15 from panel ENL, added load for new inverter IN to panel M5 and revised circuit breaker type for bathroom receptacle from arc-fault to non-arc-fault circuit breaker · 2025-06-10
[EPLAN] PLAN CHECK FOR NEW FIRE ALARM SYSTEM IN A NEW CONSTRUCTION. FIRE ALARM SYSTEM CONSISTS OF (1) FACP AND (1293) MODULES. · 2025-06-09
FULL PC FOR A MIXED USE BUILDING. SCOPE INCLUDES SERVICE SIZE OF 3,000 AMP 480/277V 3P 4W and 4,000A 208/120V and 3,000A 208/120V, DISTRIBUTION BOARDS, XFMRS, ELEVATOR MOTORS, RESIDENTIAL PNALE, COMMERCIAL PANELS, EQUIPMENT, LIGHTING AND LIGHTING CONTROLS. B# 19010-10000-05839: · 2025-06-09
[E-Plan] Changes to approved plan. Miscellaneous revisions throughout power/lighting plans, SLD, panel schedules, Title 24 forms. · 2025-06-09
Revision to approved plans. Additional distribution equipment for future commercial tenants, revised power and lighting. Plan check for power and energy.***FULL PC FOR A MIXED USE BUILDING. SCOPE INCLUDES SERVICE SIZE OF 3,000 AMP 480/277V 3P 4W and 4,000A 208/120V and 3,000A 208/120V, DISTRIBUTION BOARDS, XFMRS, ELEVATOR MOTORS, RESIDENTIAL PNALE, COMMERCIAL PANELS, EQUIPMENT, LIGHTING AND LIGHTING CONTROLS.*** · 2025-06-09