Grading for new foundation to support new tank · 2026-09-04
eplan: Marathon Oil Refinery New Foundation and Instrument Rack for Tank Gauging at existing oil refinery which includes the installation of a mat foundation along with structural steel columns to support the tank gauging equipment. · 2026-08-12
Eplan PLACEMENT OF CONCRETE FOUNDATION TO SUPPORT MECHANICAL EQUIPMENT SKID. · 2026-08-12
Miscellaneous steel supports for electrical cable tray and conduit that are being added to an existing pipe rack and existing cable tray support structure. · 2026-08-11
E-PLAN NEW 35' X 28' DETACHED STEEL FRAMED CANOPY FOR EQUIPMENT, ALL WORK PER ENGINEERING · 2026-07-23
E-PLAN.. INSTALLATION OF NEW EQUIPMENT PAD FOR MEDIA FILTER TANKS , ALL WORK PER ENGINEERING · 2026-07-16
New Structural System to Support Platform and new Piping for HCU Lopa Project · 2026-07-16
E-PLAN.GRADING FOR SITE PREPARATION · 2026-06-18
25042-10000-08974
PC Info Complete
PLUMBING T.I - POTABLE WATER AND WASTE/VENT. EXISTING 4-INCH DOMESTIC WATER METER WITH 4-INCH BFP, EXISTING SEWAGE EJECTOR. · 2026-05-26
Rental of (1) temporary package watertube boilers during repairs to existing equipment. Boilers are brand new from the manufacturer. · 2026-04-27
Rental of (3) temporary package watertube boilers during repairs to existing equipment. Boilers are brand new from the manufacturer. · 2026-04-27
Rental of (3) temporary package watertube boilers during repairs to existing equipment. Boilers are brand new from the manufacturer. · 2026-04-27
Requesting Francis Ysaguirre as this is a continuity of pl ck # E23LA01311 and permit# 23041-10000-09116.(21)13.8kV new Feeders from Sub 17 to existing and new load. (2)13.8kV to 4.16kV Transformers. (1)4.16kV Switchgear and (2)Closed coupled MCC.6690ft of RacewayGrounding, Power & Control Cables · 2026-01-08
[EPLAN] Install a new weld-receptacle in the new fuel gas dryer area. Install a new 480V-208/120V transformer and panelboard for area lighting and power. Run UPS feed from the South Area Control Room to the new Fuel Gas Dryer area. Reference plan check number 23041-10000-64935. · 2025-12-17
PC for Power only. Plans include Grounding system. Marathon petroleum will be installing a new boiler unit with two boilers. Includes 4.16kv FD fan motors per boiler. It also includes one 4.16kv boiler feed water (BFW) pump motor. All 480V boiler loads will be fed from New Sub18. Sub 18 will be fed from two new 1MVA transformers.The FD fans, BFW motors and 1MVA transformers will be fed from Main Station 4.16kV MCC-282 & MCC-283. Main station plan check has been submitted by Fluor (permit# 2304 · 2025-10-28
25041-10000-18668
PC Info Complete
[ePlan] Renovation of an existing warehouse building to accommodate new shops for maintenance provide new lighting, new circuits and panels. Plan check for energy/title24 only. · 2025-05-01
EPLAN. PLAN CHECK FOR POWER. AREAS OF WORK ARE CLOUDED. SCOPE OF WORK INCLUDES: NEW EQUIPMENT AND DEVICES IN AN OIL REFINERY. This Plan Check corresponds to the scope of work for Project 2 which entails the relocation of seven (7) 2.4 kV existing motors loads (3 under City of LA and 4 under LA County jurisdiction) and one existing 1000 kVA transformer (LA County) from Substation #4 equipment to the existing Substation #12 that was installed and commissioned under Projects 0 and 1. Two new trans · 2025-04-30