[ePlan] Supplemental/revision to approved plan set 24041-10001-40765Revision to tenant improvement. First time tenant. · 2026-09-11
EPLAN Supplemental to 24016-10000-32076 Revisions to approved tenant improvement. · 2026-09-11
EPLAN Supplemental to permit #24016-10000-32076 to update Green Room and Projection Equipment Room in level P1 and clarify framing for the level 1 expansion joint above ceiling. · 2026-09-11
[E-Plan] changes to panel schedule. changes to T-24 and emergency lighting Revision to approved plans · 2026-09-10
24044-10001-16570
Corrections Issued
**ORIGINAL PC/ ATTN: Matt Najera; PLEASE ASSIGN WITH *****REVISIONS TO PREVIOUSLY APPROVED PLAN #24044-10000-16570 TO INCLUDE UPDATING RATIONAL ANALYSIS, RELOCATING UNITS, ADDING FANS. **See Inspector correction notice requiring rational analysis for all floors. This required that the mechanical distribution plans be updated to fully match what is being installed based on site coordination updates.*** · 2026-09-10
REVISION TO PREVIOUSLY APPROVED PLANS UNDER #24042-10000-17964. INCLUDES ADDED FIXTURES TO POTABLE WATER AND WASTE&VENT SYSTEMS. ADDED SEWAGE EJECTOR SYSTEM. · 2026-09-09
EPLANRevision to approved plan to update the rated partition outlines that included core and shell ratings, to match the RSCA and Mechanical plans. · 2026-09-04
PLAN CHECK ONLY. REVISION TO #24042-10000-17964 INCLUDES REROUTING PIPING FOR POTABLE WATER AND WASTE/VENT SYSTEM. PERMIT UNDER ##24042-10000-17964. · 2026-06-25
GENERAL HVAC TI IN BUILDING WITH EXISTING SMOKE CONTROL SYSTEM. · 2025-05-13
[ePlanLA] First time tenant, New theatre and lobby space tenant improvement electrical design in new core/shell space approximate are of 17,611SF.new branch circuiting and lighting controls throughout the space. 37 STORY BUILDING · 2025-04-14
Plumbing TI. Includes potable water and waste/vent. · 2025-04-03