REVISION TO PREVIOSLY APPROVED PLANS UNDER #24044-10000-09156. REPLACE HP UNITS WITH A NEW REFRIGERANT TYPE AND OTHER MINOR CLOUDED REVISIONS. · 2026-08-28
[Eplan] Revision to approved set. The elevator room has been relocated from the roof level to the basement, and all associated electrical loads, feeders, and equipment connections have been revised accordingly. The electrical room layout has been updated per the most recent utility requirements . The lighting fixture schedules and the Title 24 compliance study have also been updated to reflect the latest lighting layouts and fixture selections. · 2026-07-01
[ePlan] Fire alarm installation for a new apartment building. 1 FACP and 108 FA devices. · 2025-12-23
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLAN 24042-10000-09452. REVISED SEWAGE EJECTOR AND SUMP PUMP SYSTEM. · 2025-12-01
POTABLE WATER SYSTEM WITH BOOSTER PUMP, WASTE&VENT SYSTEM WITH DUPLEX SEWAGE EJECTOR, AND STORM DRAIN SYSTEM WITH DUPLEX SUMP PUMP. 2" DOMESTIC WATER METER, 3" RP BACKFLOW DEVICE. · 2025-05-02
[ePlan] Plan check for power and energy for a 5-story 19-unit apartment building. Scope of work includes the installation of a new 1600A 208Y/120V 3ph-4w service, distribution, power, and lighting. · 2025-05-02
GENERAL HVAC INCLUDING GARAGE VENTILATION AND CORRIDOR VENTILATION. · 2025-05-02