[ePlan][PV3] Install 44.84 kWDC/50kWAC PV system on a commercial building. Scope of work includes the installation of 76 modules and 2 central inverters. · 2026-08-14
Revision to an approved set under Delta 3 only. Scope of work includes changes to the single line diagram, added circuits and changes to the loads to the panel schedules, changes to the Title 24 plans, and changes to the lighting and power plan layout.***Project description per applicant***Addition of new light fixture type, 120V circuits, slight room configuration (2 new storage rooms added) and change from rigid conduit to MC cable for a panel feeder. There are no changes to the single line di · 2026-04-29
[eplan] 1600A 208Y/120V 3ph-4w service, distribution, power, and lighting for new apartment building with prefabricated apartment units. Plan check for power and energy. · 2026-04-22
New fire sprinkler system per NFPA 13. 4'' fire service, 4'' DC backflow device. · 2026-04-09
REVISION TO APPROVED PLANS: REMOVE FIRE DAMPERS FROM COMMON OSA DUCTS SUPPLYING TO EACH UNIT AND ADD 2 RANGE HOODS. · 2026-04-09
HVAC SYSTEMS FOR MODULAR RESIDENTIAL BUILDING. · 2026-04-09
Revision to approved plans: HVAC ductwork and install CSFDs on sheets M2.01 and M3.01 (changes under Delta 3). · 2026-04-09
Install plumbing system including potable water,waste, vent, gas, and rainwater drainage system. 3" water meter with 3" backflow. · 2026-03-18
25043-20004-00165
Corrections Issued
PLAN CHECK ONLY. CHANGE FDC FROM 4" 3-WAY TO 4" 2-WAY FDC @ 500 GPM · 2026-03-06
Installation of cabeled electric elevator. · 2026-03-04
[ePlan] New fire alarm system with FACP (1),ComD (1),FD (228),CP (3), voice evac system · 2026-02-19
Plan check only. Addition of heads, change of backflow make/model, and revision of calculations per narrative. · 2026-02-05
Revision to riser diagrams to add fixtures and change pipe sizing. · 2025-10-06
PLAN CHECK ONLY. REVISION TO APPROVED PLANS PER NARRATIVE. · 2025-09-08
Plan check only. Change sprinkler types.(Changes under Delta 2). · 2025-08-08
REVISION TO APPROVED PLANS.(Updated Sheet M1.03:- VRF HEAT PUMP OUTDOOR UNIT SCHEDULE-- VRF FAN COIL UNIT SCHEDULE.- SPLIT DX FAN COIL UNIT SCHEDULE.) · 2025-08-06
[ePlan] Plan check only. Changes to approved set including revisions in single line diagram, panel schedules, floor plans, and photometric calculations. · 2025-07-24
Plan check only. Change to fixtures and riser diagrams. · 2025-06-14