(Eplan) Plan check only. REVISION: CHANGE IN AC DISCONNECTS LOCATION*INSTALL RESIDENTIRAL ROOF MOUNTED SOLAR PV SYSTEM & ESS / PLEASE EXPEDITE*Attn Plan checker: Samer Wehbe · 2026-09-09
(EPlan) Deltas 1 2 an 3 clouded changes only. Scope of work includes Changing PV system from central inverter connection to microinverter connection. Adding 19 mircoinverter , 1 combiner box . ***Applicant*** REVISION: Previously, the solar system was designed as a DC coupled system. Thesystem has now been revised to an AC coupled configuration utilizing IQ8HCmicroinverters with Combiner 5, and the solar system has been connectedthrough the Gateway accordingly. / Gateway 1 has been updated to · 2026-06-24
(EPlan)Plan check only. Clouded changes only. Changes to an approved set, scope of work consists of relocating/adding a non fused disconnect switch.Atten:Edwin Lizarraga REVISION REASON: DISCONNECT ADDED BY MSP / PLEASE EXPEDITE · 2026-04-05
(EPlan) PV1 for installation of roof mounted solar panels and installation of energy storage system. PV system includes 19 modules with 7 RSDs, 2 Tesla Powerwalls, 2 energy storage systems, and 2 panels connected to existing main service panel. System size is 7.79kW DC/23.00kW AC. · 2026-01-13
Plan check for medium pressure gas to existing low pressure gas system. See the application comment. · 2025-05-02