REVISION TO PREVIOUSLY APPROVED PLANS UNDER #26042-10000-00579. UPDATED LOADS FOR POTABLE WATER SYSTEM, HYDRAULIC CALCULATIONS, AND LOW PRESSURE GAS SYSTEM RISER DIAGRAM. · 2026-09-11
25014-10002-05742
Quality Review Completed
*eplan*Attn: Quan Nghiem. Field Changes to the scope of work to reduce the cost of the project. Supplemental scope of work includes adjustments to some windows and doors for future tenants, removal of trash enclosure (project no longer has a food use), the change from new gas meters to reuse of existing gas meters, reduction in shell lighting provided, new structural columns changed to existing structural columns found during demolition, new ramp changed from all concrete to a mix of concrete a · 2026-09-09
200 AMP TEMPORARY POWER POLE · 2026-09-04
CORE & SHELL PLUMBING T.I. INCLUDES POTABLE WATER, WASTE/VENT, AND LOW PRESSURE GAS SYSTEM. 2" DOMESTIC WATER METER; 2" BACKFLOW DEVICE. · 2026-08-10
25041-10000-59368
Verifications in Progress
EPLAN. CORE AND SHELL DESIGN FOR TWO NEW FUTURE RESTAURANTS AND ONE SPACE FOR RETAIL/SALES. INSTALL 800A SERVICE, PANELBOARDS WITH CIRCUITS, LIGHTING, NEW LIGHTING FIXTURES. PLAN CHECK FOR POWER AND ENERGY. · 2026-03-12