eplan Interior improvements & finishes for existing 1st grade & kindergarten classrooms, includes a remodel of an existing kindergarten restroom. only interior remodeling of existing spaces, no added floor area or exterior renovations. · 2026-08-28
ELECTRICAL SCOPE OF WORK: LIGHTING SYSTEM MODERNIZATION PROJECT FOR AN EXISTING CLASSROOM BUILDING PART OF AN ELEMENTARY SCHOOL CAMPUS.THIS SCOPE OF WORK ADDRESSES THE ELECTRICAL MODIFICATIONS NEEDED TO MODERNIZE THE LIGHTING SYSTEM IN FOUR CLASSROOMS (APPROXIMATELY 3,164 SQ FT) WITHIN AN EXISTING ELEMENTARY SCHOOL BUILDING. THE PROJECT INVOLVES A COMPLETE REPLACEMENT OF ALL EXISTING LIGHT FIXTURES WITH NEW LED FIXTURES. THE EXISTING ELECTRICAL INFRASTRUCTURE PROVIDING POWER TO THESE SPACES WILL · 2026-08-17
REMODELING OF EXISTING KINDERGARTEN RESTROOM, REPLACE OF EXISTING FIXTURES AND INSTALL NEW PLUMBING FIXTURES. · 2026-08-14
Install new exhaust fan duct work for bathroom · 2026-07-15
25041-10000-33417
PC Info Complete
This document details the electrical modifications necessary for the comprehensive upgrade of the power distribution system across five specified locations. The project involves the replacement of existing electrical panels with new equipment, primarily driven by identified fire and safety hazards and the fact that the current panels have exceeded their operational lifespan. No alterations to the existing electrical circuits feeding these panels are included, and no additional load will be intro · 2025-08-15
[EPLAN] MODERNIZE LIGHTING SYSTEM IN THREE CLASSROOMS AND A MATH LAB WITHIN AN EXISTING ELEMENTARY SCHOOL BUILDING. TOTAL AFFECTED AREA IS 2,602 SQFT. PLAN CHECK FOR ENERGY. · 2025-08-12