[ePlan] Power plan check for a 800A 120/240 VAC 3 PHASE/4WIRE temporary power equipment. **Scope provided by applicant: Please issue a permit for the following temporary power equipment. Temporary power is needed for construction of new apartments. Project is - Jules. (1) - 800 AMP Switchboard 120/240 VAC 3 PHASE/4WIRE (1) - 225 AMP 240 VOLT 3 PHASE 65 KAIC BREAKERS (FD63B225)(1) - 400 AMP 240 VOLT 3 PHASE 65 KAIC BREAKERS (JD63B400) · 2026-09-08
26043-10000-03377
Quality Review Completed
NFPA 13 SYSTEM. 4" FIRE METER, 4" BACKFLOW PREVENTER. · 2026-08-27
SUPPLEMENTAL TO 25042-10000-15807. REVISION TO WASTE/VENT RISER AND ADDITION OF DRAINS. · 2026-07-23
25047-20000-01692
PC Info Complete
NEW 12'-0" x 12'-9" SPA ON 4TH FLOOR DECK OF (E) 5-STORY APARTMENT PER ENGINEERING · 2026-06-25
25047-20000-01691
PC Info Complete
NEW 29'-6" x 17'-6" POOL ON 4TH FLOOR DECK OF 5-STORY APARTMENT PER CITY STD. PLAN 268 AND ENGINEERING DETAILS · 2026-06-25
NEW PLUMBING SYSTEM. INCLUDES POTABLE WATER WITH BOOSTER PUMP, WASTE/VENT WITH DUPLEX SEWAGE EJECTOR SYSTEM, RAINWATER WITH DUPLEX SUMP PUMP AND LOW PRESSURE GAS. 6" DOMESTIC METER WITH BACKFLOW. · 2026-06-11
NEW MECHANICAL SYSTEM. INCLUDES HVAC, GARAGE VENTILATION. ***INCLUDES A2L CALCULATIONS*** · 2026-05-14
Temporary Generator · 2026-05-04
[ePlan] Energy and power plan check. New 281- unit, 8-story apartment building with 1 level underground parking. New 5000 amps 480/277V 3p 4w service. Plan check for power and energy. 180,307 sf. · 2026-04-29