(EPlan) separate one of the two elevators currently being fed from an existing 100A 3 pole breaker by adding a new 100A 3 pole breaker and feeding each of the elevators via the existing and the new 100A 3 pole breakers.Note to Inspector: (2) Sets of Existing #4 AWG feeders, connected to Existing Elevators, shall not be connected in parallel. Provide #1/0 AWG Min Subject to Field Inspection. · 2026-09-10
PLUMBING T.I. FOR POTABLE WATER ONLY. RELPACING BOOSTER PUMPS AND ADDING NEW FIXTURES. · 2026-04-23
25044-10000-11178
PC Info Complete
REPLACEMENT AND ADDITION OF HVAC EQUIPMENT ON ROOF. INCLUDES PLAN CHECK FOR EXISTING REFRIGERATION MACHINERY ROOM. · 2026-04-07
Plan check only for clouded revisions to an approved Title 24 set. See change narrative for details. *** Applicant work description below: *** THE SCOPE OF WORK FOR THIS PROJECT IS TO PROVIDE REQUIRE POWER CIRCUITS, UPSTREAM CONTROL AND PROTECTION SYSTEM FOR MEZZANINE/LOW ROOF, ETC. HVAC UPGRADES AND THE MECHANICAL ROOM LIGHTING MODERNIZATION AS INDICATED ON PLANS. · 2026-01-14
25041-10000-45640
PC Info Complete
(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 3,290 sf. · 2025-12-31
25041-10000-48525
PC Info Complete
(EPlan) Title 24 plan check for energy only for mezzanine/low roof. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 1310 sf. · 2025-12-03