PLAN CHECK ONLY. REVISION TO PRV AND SEISMIC BRACING CALCULATIONS. · 2026-09-09
U.C**Attn: Joe Vo ***Supplemental to 25030-10000-06296 Site grading for installation of LID and LADBS Grading Division approved drywell and LID BMPs to permit scope per attached LADBS inspection correction notice. · 2026-08-27
Supplemental to Permit No. 25016-10000-19205 to allow revisions to approved plans. · 2026-08-17
26016-20000-13902
PC Info Complete
ePlan. Install a Rooftop Solar PV System on (E) Commercial Building with (402) VSUN SOLAR VSUN595N-144BMH-DG (595W) MODULES and (101) AP SYSTEM QT2-480V MICROINVERTERS · 2026-07-15
Supplemental to Permit No. 25044-20000-07361 to allow revisions to approved plans. · 2026-06-30
E-plan, Supplemental to Permit 25041-10000-30580 delta 4 only, Mechanical equipment has been updated to reflect MP changes and coordination. Duct Heaters have been removed per the latest mechanical revisions.All HVAC equipment has been coordinated per the latest mechanical revisions.Fixture L3 & L4 added for decorative fixture.Updated building fixtures along outside of building.SES size updated to match existing system. Plan check only. · 2026-06-06
26041-10000-15430
Quality Review Completed
INSTALLATION OF A ROOF MOUNTED 239.19 KW DC AND AC SIZE: 181.8 kW AC WITH (402) VSUN SOLAR VSUN595N-144BMH-DG (595W) MODULES AND (101) AP SYSTEM QT2-480V MICROINVERTERS. INTERCONNECTION STRATEGY VIA A BACKFED BREAKER. (NO SUPPLY SIDE CONNECTION). · 2026-05-04
T.I. General HVAC. · 2026-03-20
T.I Plumbing for potable water and waste/vent. existing water meter. · 2026-03-20
[eplan] Provide new panels, power and lighting for change of use from existing retail and office to self-storage. Exsitng electrical service, distribution to remain. Plan check for power and energy. · 2026-03-20
[ePlan] New fire alarm system with (1) FACP and (171) FA Devices. · 2026-03-19
FIRE SPRINKLER AND STANDPIPE SYSTEMS. 8" FIRE METER. 8" BACKFLOW DEVICE. · 2026-03-17