[ePlan] Plan check only. Changes to the approved set (25041 - 10000 - 60328). Plans revised to show methane mitigation design requirements for the installation of underground feeders. Adjusted feeder length values to reflect the revised underground routing. Updated voltage-drop and short-circuit calculations based on increased conductor lengths. · 2026-09-10
Install CCTV system · 2026-08-26
LEVEL 1 METHANE MITIGATION SYSTEM · 2026-08-12
Relocate water line. Add extension vent pipe toexisitng pipe. Relocate gas linesEngineering Sewer # 50526-65 · 2026-07-14
(EPlan) Power plan check, New upgraded 600A services being installed to an existing apartment building, new panel included in scope of work. THIS PROJECT ENTAILS A COMPREHENSIVE REFURBISHMENT AND UPGRADE OF THE ELECTRICAL SERVICE FOR THE EXISTING TWO STORY 14-UNIT APARTMENT BUILDING. FUTURE UNIT APPLIANCE UPGRADES: WHILE NOT PART OF THIS SCOPE, ALL APARTMENT UNITS ARE PLANNED TO RECEIVE NEW APPLIANCES UNDER A SEPARATE PERMIT. THE ELECTRICAL SERVICE DESIGN INCORPORATES A WORST-CASE SCENARIO FOR A · 2026-07-09