*** WILDFIRE 2025 ***GENERAL HVAC WITH (5) TYPE I HOODS; (1) TYPE II HOOD AND A2L REFRIGERANT · 2026-09-12
***WILDFIRE PROJECT***FIRE SPRINKLER TI. · 2026-09-09
Connect new notification equipment to existing power supply for the unit space. Install duct detection and shutdown fore new HVAC equipment and connect to the existing fire alarm control panel. Connect mezzanine level equipment to existing circuit in local corridor as shown on this plan. The balance of the system will remain "as-is". · 2026-09-08
[ePlan] Revision to permit 26041-10000-02049 Delta 9.Sheet E0.03 Added four (4) CONV-5 outlets to Kitchen Equipment Schedule.Sheet E2.10 Updated vanity lighting in ADA Women 104 updated per sink relocation.Sheet E3.10 Added two (2) 20A dedicated outlets for AV/IT racks. Added four (4) junction boxes and circuit information for future TVs at BAR 116. Added four (4) Conv-5 dedicated outlets at Bar 116. Added floor box and circuit information at Dinning 110.Sheet E5.02 Revised Panel Schedule 1P · 2026-08-14
**2025 Palisades Wildfire Project***Supplemental to 25016-10000-37389 For Revision to approved plans. · 2026-08-13
***2025 Wildfire Palisades Wildfire Project** Supplemental to 25016-10000-37493 to Update construction type of patio to TYPE VB · 2026-08-13
***2025 WILDFIIRE PROJECT*** PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #25042-10000-22339. UPDATED WASTE&VENT RISER DIAGRAM. · 2026-08-03
REVISION TO PREVIOUSLY APPROVED PLANS TO INCLUDE ADDITIONAL LOW PRESSURE GAS OUTLETS. · 2026-07-07
[ePlan] Supplemental tenant improvement of commercial space for outdoor lighting, energy, and power. Title 24 only affected area is 1145SF.*** Applicant work description below: *** Revision to include exterior TI work. · 2026-07-07
**2025 Wildfire Project** Supplemental permit to 25016-10000-37493 for revisions to approved plan to add design details and revise structural design. · 2026-07-01
*** WILDFIRE 2025 *** PLUMBING T.I. LOW PRESSURE GAS SYSTEM · 2026-06-11
*** WILDFIRE 2025 ***TI. POTABLE WATER, WASTE/VENT WITH SEWAGE EJECTOR, AND LOW PRESSURE GAS SYSTEM · 2026-06-11
(EPlan) Full plan check, new panels and transformers being added to power distrubution board and new circuits for tenant imrpovement.Total Area Affected: 2935 SF Restaurant remodel project. Area served from existing shopping center utility service. Includes new commercial kitchen, dining, and remote storage. New panels, transformers, lighting, power devices, and mechanical equipment. · 2026-06-09
**2025 WILDFIRE PROJECT** ENLARGE OUTDOOR DINING PATIO FOR (E) RESTAURANT . · 2026-05-29
*** 2025 Wildfire *** TENANT IMPROVEMENT RESTAURANT WITH REMOTE DRY STORAGE SUPPORT SPACE AT BASEMENT MEZZANINE, SPACE B1M 102. · 2026-05-18