**2025 Wildfire Project** Early Start Foundation ONLY for 26010-10000-01818 2-story Elementary School · 2026-08-31
26042-10000-10121
Corrections Issued
***WILDFIRE PROJECT. APPLICANT REQUESTS VARANT AS PLAN CHECKER***POTABLE WATER, WASTE/VENT AND STORM DRAINAGE. 2" WATER METER.*****PER THE BUILDING PERMIT, THE EXISTING SUBTERRANEAN LEVELS ARE TO REMAIN. EXISTING SEWAGE EJECTOR IS SHOWN WITH AN ADDED FLOOR DRAIN. PLAN CHECKER PLEASE VERIFY IF LOAD HAS BEEN ADDED TO THE SEWAGE EJECTOR AND REQUEST CALCULATIONS. APPLICANT STATES NO NEW LOAD HAS BEEN ADDED. Palisades Fire Rebuild of 2 story elementary school with existing to remain below grade parki · 2026-08-14
26041-10000-20611
Verifications in Progress
[ePlan] ***2025 Wildfire Project***Palisades Fire Rebuild of 2 story elementary school. All existing electrical distribution system will be replaced with new. New 600A 277/480VV 3PH 4W service, 800A distribution board, sub panels, power and lighting. Total affected area is 62,015 sqft. · 2026-07-31
26010-10000-01818
Verifications in Progress
**2025 Wildfire Project** This project qualifies under executive order 1 for the Palisades Fire Rebuild. It entails a like-for-like replacement of an existing two-story elementary school campus, with an allowable increase of up to 10% in building footprint. The existing two-level subterranean parking structurelargely unaffected by the firewill be retained and incorporated into the new design. Original building permitted in 2004. The above-ground program includes elementary classrooms, administra · 2026-07-14