(EPlan) PV2 for installation of roof mounted solar panels. PV system includes 34 modules and 1 central inverter system connected to existing main service panel. System size is 18.7kW DC/20kW AC. New roof top solar installation of photovoltaic system · 2026-09-11
23010-10003-01915
Quality Review Completed
EPLAN Supplemental to permit #23010-10000-01915 for revised glass structural calculations in Anchorage, handrail Anchorage and roof ladder anchorage. · 2026-09-09
23030-10002-03634
Corrections Issued
EPLAN Proposed revisions to permit# permit 23030-10001-03634. · 2026-08-24
23042-10001-24268
Corrections Issued
*** PREV PC: KARINA B. ***REVISION TO PREVIOUSLY APPROVED PLAN UNDER 23042-10000-24268. ADDITION OF PLUMBING FIXTURES. REVISION TO HYDRAULIC CALCULATIONS AND RISER DIAGRAMS · 2026-08-17
Roof Truss defered approval for 23010-10000-01915. · 2026-08-03
ePlan: SUPPLEMENTAL TO PERMIT #23030-10000-03634 TO REVISE GRADING.2 OF 2 · 2026-07-16
EPLAN Supplemental to permit #23010-10000-01915 for changes to existing building per revised Site Grading. Revise parking count. 1 OF 2 · 2026-06-25
PLAN CHECK ONLY. PERMIT UNDER 25043-10000-04814. REVISION TO UNDERGROUND PIPING. REVISING 10" FIRE METERS TO 8" AND BACKFLOW PROTECTION FROM RP TO DC TYPE. · 2026-06-16
INSTALLATION OF FOUR FIRE SPRINKLER OVERHEAD SYSTEMS PER NFPA-13. INCLUDES FIRE PUMP. (2) 10" Fire Service Meter and (2) 10" DC. · 2026-02-05
Underground Fire Line and (3) hydrants. (2) 10" Fire Service Meter and (2) 10" DC · 2025-12-03
E-plan. Electrical Permit for a new 151,725 SF Industrial/Warehouse Distribution Building and Facility. New 5000 amps 277/480 V 3 phase 4 w service, new distribution boards, new panels, equipment, and lighting. · 2025-11-18
POTABLE WATER AND WASTE/VENT SYSTEM. EXISTING 2" DOMESTIC WATER METER; EXISTING 2" BACKFLOW PREVENTER. · 2025-11-17
GENERAL HVAC. · 2025-11-17