[ePlan] New PDUs, RPPs, and electrical panels to support increased IT load within the existing data center with no changes to utility service or main distribution system. T24 affected area 38174sf. · 2026-09-08
DESIGN AND INSTALL(1) REMOVE FIRE ALARM, SHUTDOWN WIRING FROM CRAC (RIP)UNITS - 1, 11, 15 , 19, 27, 28, 55, 56.(2) INSTALL MONITORING MODULE AND SHUTDOWN MODULE FOR NEW CRACUNITS - 1, 4, 9, 11,15, 17, 19, 23, 25 - 28, 30, 36, 43, 48, 52-57. · 2026-08-25
26016-10000-13551
Quality Review Completed
The project consist of retrofitting an existing data center building where the scope of work consists of the removal of (8) existing end-of-life DX CRAC units and replacing with like for like units in addition to installing (14) new DX CRAC units of the same capacity along with the added structural cubs needed to support the new units in the roof. In addition, there is a cage layout added to interior floor area denoted in the architectural drawings to support future data infrastructure with adde · 2026-06-17