26016-20000-11466
Verifications in Progress
NEW 6' TALL CMU WALL/RETAINING WALL? · 2026-08-13
NEW PLUMBING. POTABLE WATER AND WASTE/VENT. 3-INCH DOMESTIC WATER METER AND 4-INCH BACKFLOW. · 2025-10-27
Storm Water Plumbing: 13 rain water drains only. · 2025-10-21
Changes to an approved set of plan, approved set is provided. Redesign of game room to ADU unit to include bathtub, kitchen area and lighting. update of single line diagram to include new panel board "ADU/204" and connected to house paneld board "HP1" · 2025-10-15
HVAC SYSTEM WITH GARAGE VENTILATION. · 2025-10-09
REVISION TO APPROVED PLANS - REVISED EQUIPMENT SCHEDULE AND ADDED OSA VENTILATION FOR NEW ADU · 2025-10-08
(E-PLAN)FULL POWER PLAN CHECK FOR AN APARTMENT BUILDING WITH A 1200 AMP, 120/208, 3-PHASE 4-WIRE SYSTEM. SCOPE OF WORK INCLUDES TYPICAL UNIT PANELS, ALL OTHER PANELS, SWITCHBOARDS, MOTORS, LIGHTING, CONTROLS, AND CIRCUITS.TOTAL AFFECTED AREA: 12630 SQ FT · 2025-09-11
Install new hydro electric elevator. · 2025-08-04
EPLAN. Install new fire alarm control panel and fire alarm devices. · 2025-07-15
(EPLAN); FACP relocated to elevator lobby, Elevator Control Room has been relocated to 1st floor, Smoke Detector added above the FACP, Manual Station added at the FACP location, Heat detector, strobe, and relay module modified. · 2025-05-31
20041-10002-21273
PC Info Complete
E-plan, Revised the single line diagram, added the new ATS and Generator that isconnected to the Elevator.- The elevator horsepower is now 40HP.- Updated the overall load calculation and fault current as per updatedhorsepower of an elevator.- Added SD080 Generator Fuel Consumption and Emergency Generator SetLoad Calculation for additional details.- Added reference notes 12 to 15 to call-out the ATS and Generator in thesingle line diagram.- Fault current calculation has been provided in ATS-ELEV · 2025-05-13