Rewire of existing unit and installation of 18 new branch circuits, 20 new recess lights and new 100 AMP Sub-panel. · 2026-08-17
(1) Kitchen remodel for residential buildings (no structural changes)(8) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2(b) 1B of Title 24.Replace drywall (no new walls added) for single family dwellings and duplexes only."COMPLY WITH DEPARTMENT ORDER effective date08/04/2026. PERMIT WIL · 2026-08-12
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 12 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 (b) 2B. "COMPLY WITH DEPARTMENT ORDER effective date08/04/ · 2026-08-11