Due to a layout/stringing field change, we reallocated of 5 total modules from the NW roof to the PV array on the SE roof PV array. The modules will remain in place on the their respective roof, but stringing will change between arrays/rooftops. Total DC system size reduced by -2.75kW on NW roof and +2.75kW on SE roof. Additionally we are using an alternate conduit route, moving from the original bridge crossing over E. 14th St. (private) to new U/G trench between buildings across E. 14th St. · 2026-09-09
Changes to permit : 25041-10000-33242, Field change for new PV new disconnect location. Typos have been corrected to correctly identify the number of modules and optimizers in eachof the two systems. See sheets E-3.1 and E-3.3. Delta 1 and Delta 2. · 2026-09-05
26016-10000-17535
Verifications in Progress
ePlan. TI TO (E) MANUFACTURING BUILDING. · 2026-07-24
[ePlan] Interconnection of two 4000A 480V 3PH service switchgear Interconnection only for new commercial rooftop solar PV project located on adjacent APN. This scope of work is for the interconnection switchgear located on APN 5130-010-048. A separate permit has been submitted for the Solar PV portion on the adjacent parcel. This project is located on the Coca Cola Bottling campus which is made up of 2 parcels w/ 2 addresses. A lot tie has been obtained. PV permit under 25041-10000-33242 · 2026-06-24
Tenant improvement for energy only in existing space. · 2025-03-28