26041-10000-02373
Verifications in Progress
(EPLAN) TENANT IMPROVEMENT, POWER AND ENERGY PLAN CHECK OF AN EXISTING COMMERCIAL BUILDING FOR A PRODUCT SORTATION AND DELIVERY SERVICE PARKING FACILITY. SCOPE OF WORK INCLUDES NEW 2500A SWITCHBOARD, NEW PANELS & CIRCUITS. TOTAL AREA 81,126 SQ FT. · 2026-08-27
25016-20000-29466
Verifications in Progress
ePlan:CAHNGE OF USE & T.I OF PORTION OF AN (E) BUILDING FOR A PRODUCT SORTATION & DELIVERY SERVICE PARKING FACILITY. · 2026-08-27
26041-10000-29506
Quality Review Completed
(Eplan) PROVIDE WIRING AND POWER TO NEW MATERIALHANDLING EQUIPMENT IN AN EXISTING COMMERCIAL BUILDING. MECHANICAL WORK TO BE SUBMITTED UNDER A SEPARATE PERMIT. THERE ARE SEPARATE PERMITS BEING PULLED BY THE GC FOR THE FACILITY POWER ALONG WITH OUR MECHANICAL MHE PROVIDER/INSTALLER. ALL EQUIPMENT AND INSTALLATION DETAILS DEPICTED IN THESEDRAWINGS ARE NEW. A 1200-AMP FEED TO PANEL MHE1 WILL BE PROVIDED BY OTHERS. new Electrical Service for Conveyor System Install. · 2026-08-13
plan check only. supplemental submittal - Bldg. 1 OH - Fire pump manufacture changed. · 2026-06-27
SUPPLEMENTAL TO 22010-20000-00609 TO REMOVE THE PROPOSED MEZZANINE AND THE OFFICES AND REVISE THE FLOOR PLAN & STR PLANS · 2026-05-13
Supplemental plan revision to add 12 heads to 2 trash enclosures.Plan check only. · 2026-04-08
REVISIONS TO APPROVED PLANS: REVISED SHEETS FP-2 & FP-3 (CLOUDED DELTA 3) TO USE 2.5" RISER NIPPLES INSTEAD OF 2" RISER NIPPLES.PLAN CHECK ONLY. · 2026-03-26
T.I Garage Ventilation only. · 2026-02-17
Plan check only. General revisions per narrative. · 2026-01-13
Plan check only. General HVAC revisions per narrative. · 2026-01-13
[eplan] DELTA "4" Revisions to approved plans. Service rating increased from 2000A to 3000A 480Y/277V 3ph-4w, power/lighting plan updates, panel schedules revised. Title 24 form square footage massively changed (not clouded).*** Elect. Permit Revision Original PC/Permit #: E22VN00521 (22041-20000-17056)Scope of work changes per Owners marketing request.1.Add 2 small offices and one single accommodation restroom to the approved mezzanine open office TI area.2.Add the warehouse lighting.3.Sligh · 2025-12-17
Plumbing revision to approved plans. Addition of plumbing fixtures. Work includes potable water and waste/vent. Existing 2" water meter. · 2025-11-19
plan check only. UG Revision per inspection. Additon of (2) sectional valves & removing (2) above ground check valves. · 2025-09-26
REVISION TO APPROVED PLANS: UPDATE 10" BACKFLOW TO FIRE PUMP, SPRINKLER FLOOR PLAN LAYOUTS, SEISMIC BRACING AND HYDRAULIC CALCULATIONS.PLAN CHECK ONLY. · 2025-04-03