EPLAN: NEW 6' HIGH, 325' LONG CMU BLOCK WALL PER ENGINEERING · 2026-07-14
Site grading and RR for a New 6-Story, 164-Unit (100% affordable housing) apartment with 5-level, Type IIIA, apartment over 1-level, Type IA ground floor parking/lobby over 1-level subterranean parking basement under 22010-10000-01368 · 2026-07-13
[E-Plan] DELTA "B" Changes to Approved Plan. Relocation of circuits and equipment. Adjusted lighting layout. Relocating transformers, revising circuit designations, emergency lighting revisions, and additional updates. · 2026-06-26
Clouded delta B revisions to an approved set. Plan check only.*** Applicant work description below: *** 1.CIRCUIT BREAKERS FOR SWBD's MSD, MSE, MSF, AND MSG CHANGED TO 100A. UNIT 312 IS FED FROM MSC AND UNIT 316 IS FED FROM MSF.2. CHANGES TO AN APPROVED SET · 2026-02-28
[ePlanLA] PLAN CHECK FOR power and energy, 5,000A, 120/208V, 3ph, 4W Service, 2 Elevators (40HP), (B# 22010-10000-01368) · 2026-01-20
[E-Plan] DELTA "A" Changes ONLY. 1. REDISTRIBUTION OF DWELLING UNITS TO METER BANKS. 2.REVISION OF SERVICE CONDUCTORS. 3.REVISION TO CIRCUIT BREAKERS FEEDING DWELLING UNITS.4. REVISION OF FEEDERS FOR ALL DWELLING UNITPERMIT NUMBER: 22041-10000-52483 · 2025-12-24
Plan Check Only. update plans to match as built due to structural and architectural site conditions. · 2025-11-21
Revision to approved plans to revise size of the garage exhaust duct. · 2025-10-01
Install new HVAC system including split PTAC heat pumps, ventilation fans, garage ventilation system, and ducts. · 2025-08-14
TI: Addition of new fixtures to existing potable water,waste, and vent systems due to addition of ADUs. · 2025-06-26
new fire sprinkler system per NFPA 13. 4'' fire service, 4'' backflow device. · 2025-04-29