[ePlan] New fire alarm system with FACP (3), FD (389),CP (3)**Applicant notes, Fire Alarm with voice evacuation and smoke control. · 2026-09-09
EPLAN DEFERRED SUBMITTAL TO 18016-10000-15736 for miscellaneous Wall rails, Handrails and Ramp Rails on level P1 and Level 1 · 2026-06-01
Make changes to the previously approved plan. Plan check only. Permit fees paid under 24044-10000-03304. · 2026-05-21
Supplemental permit to 18016-10000-15736 to remove one parking space and change to loading area with alteration to the (E) driveway. · 2026-05-13
(2) Hot water storage · 2026-04-29
24041-10002-56428
PC Info Complete
(EPlan) Supplemental to an approved set. Revisions for delta C clouds only. No new equipment being added.Atten: Francis Ysaguirre Attn: Francis Ysaguirre During the initial plan check, a correction noted our voltage drop calculations were based on aluminum conductors while the feeder schedules showed copper. We confirmed aluminum was the design intent but did not update the schedules in the prior resubmittal. This resubmission revises the single-line diagrams and feeder schedules to aluminum to · 2026-03-31
PLAN CHECK ONLY. REVISION TO SWAY BRACING. PERMIT UNDER #24043-10000-01647. · 2026-02-26
PLAN CHECK ONLY, PERMIT UNDER 24044-10000-03304. REVISION TO REMOVE FRESH AIR LOUVERS ON 2ND FLOOR. · 2025-11-07
[ePlan] New fire alarm system with 1 FACP, 1 COMD, 373 FD, 3CP · 2025-10-29
Install new subpanels for ground level and 7th level restaurant to be remodeled for existing 7 story hotel. Provide new power and lighting. Existing switchbords. Plan check for power and energy. · 2025-07-22
updated drawing E-510 illustrates the proposed lighting control. · 2025-07-05
(3) New Cabled Elevator installation. (2 typical) · 2025-05-30
GENERAL HVAC, VRF SYSTEM, GARAGE VENTILATION, THREE (3) TYPE I HOODS, SMOKE CONTROL, STAIR PRESSURIZATION, CORRIDOR DEPRESSUIRZATION, AND PASSIVE SMOKE CONTROL. · 2025-05-09