INSTALLATION OF A NEW SPA. · 2025-11-18
REVISION TO PREVIOUSLY APPROVED PLANS. REVISION TO POTABLE WATER, WASTE/VENT MEDIUM PRESSURE GAS, RAINWATER, SUMP PUMP, AND SEWAGE EJECTOR · 2025-11-18
Install (1) hydraulic elevator. · 2025-10-31
NFPA 13 FIRE SPRINKLER SYSTEM WITH STANDPIPES. NEW 6" FIRE WATER METER, NEW 6" BACKFLOW. · 2025-09-18
[ePlan] Plan check only. Updated single-line diagram feeder sizing based on construction changes. · 2025-08-12
[eplan] New fire alarm system. FACP, annunciator, (6) remote power supplies, and (279) signaling and notification devices. · 2025-07-21
[ePlanLA] Changes to an approved set of plan, changes include update unit dwelling unit floor plan include lighting fixture and receptacle location, update service load calclation, update single line diagram to show pull section, update feeder size, update lighting fixture schedule, update branch circuits on panel schedule, update voltage drop and short circuit calculation, update equipment location on floor plan, update branch circuit on floor plan, revised lighting plan, update emergency photo · 2025-07-21
[ePlan] Power plan check only for temp power. Scope of work includes (1) 600A 480/277V 3ph service, (1) 75KVA transformer, and (1) sub panel. · 2025-07-21
EPLAN. PLAN CHECK FOR A FIRE ALARM SYSTEM. SCOPE OF WORK INCLUDES: (1) FACP AND (256) FIRE ALARM DEVICES. · 2025-07-21
REVISION TO PREVIOUSLY APPROVED PLANS UNDER 21042-10000-13159. REVISION TO WASTE/VENT TO ADD BACKWATER VALVES TO THE FIRST FLOOR FIXTURES AND RAINWATER SYTEM TO ADD RAIN WATER DRAINS. · 2025-07-15
Plan check only for a revision to an approved set under clouded areas only. Scope of work includes changes to the single line diagram. ***Supplemental plan check 16041-10004-42198*** SCOPE OF WORK FOR SUPPLEMENTAL PLAN CHECK:-ALL CHANGES ARE CLOUDED ON THE FOLLOWING SHEETS.-UPDATED ELECTRICAL LOAD SIZE CALCULATIONS-ADDED NEW LIGHT FIXTURES TO LIGHT SCHEDULE-UPDATED LOAD SCHEDULES FOR NEW FIXTURES AND EXIT LIGHTING-ADJUSTED CONDUIT RUN FOR MSA-RELOCATED TRANSFORMER PAD -ADDED OUTSIDE LIGHTING FI · 2025-07-08
INSTALLATION OF (1) CABELED ELEVATOR · 2025-07-08
INSTALLATION OF (1) CABELED ELEVAOR · 2025-07-03