New Branch Circuits · 2026-09-11
Relocation of existing fan coil units. · 2026-09-11
[Eplan] Title 24 plan check for energy only. Total area is 105,591 sqft. · 2026-09-02
Plan check only for revisions to approved Title 24 set exceeding 30,000SF.*** Applicant work description below: *** Lighting installation · 2026-08-24
GENERAL HVAC. INCLUDES VRF, (4) TYPE-I HOODS, AND (2) TYPE-II HOODS. · 2026-08-21
(1) 20A CIRCUIT FOR PREACTION PANEL ON 4TH FLOOR. · 2026-08-12
EPLAN Demo of tenant convenience stair from level 2 to level 4. Convenience stair on level 5 down to 4 to remain. Floor openings at removed convenience stairs runs on level 3 and level 4 to be infilled with post tensioned concrete. Concrete infill of existing opening on level 4 where convenience stair was not installed per previously approved plans. · 2026-08-07
eplan Supplemental to permit # 25016-10000-37852 for Structural post tension slab (repair and recoupling). · 2026-08-07
EPLAN Supplemental to permit #25016-10000-37852 for Slab opening infill and PT tendon repair at Level 4, as shown at Gridline A6A7/ABAC.The referenced permitted repair area under Permit No. 25016-10000-37852 is located at Gridline CECD / W2W5, while the new requested repair area is located at Gridline A6A7 / ABAC.The scope of work consists of slab opening infill and PT tendon repair and follows the same repair methodology as the previously approved permit. · 2026-08-07
Reconfigure two(2) existing outdoor condensing units. Relocate two(2) existing indoor ducted fan-coil units. Demo ductwork for various locations of the building. · 2026-08-03
Title 24 plan check for energy only. Scope of work includes new panels, new lighting, and new circuits. Total area is 84,709sf. · 2026-07-23