25044-10000-09833
PC Info Complete
HVAC T.I. ADDITION OF (3) NEW TYPE I HOODS AND (1) TYPE II HOOD. · 2026-09-11
25041-10001-40287
PC Info Complete
(EPlan) Changes to 25041-10000-40287 Revision 6, Updated wattage of light fixture F2 and F3, Updated total numbers of luminaires.Updated lighting layout at marketplace, dining room, caf, restroom, BOH and patio. Updated the entire Panel C, Panel D, and Panel E loading. In Panel A, updated KEFs loading. · 2026-08-18
25042-10001-16048
Quality Review Completed
***EXPEDITE****** OG PC = CRISTINA *** REVISION TO PREVIOUSLY APPROVED PLANS UNDER #25042-10000-16048. UPDATED FIXTURES AND EQUIPMENT, REVISED SEEWAGE EJECTOR SYSTEM, AND UPDATED POTABLE WATER, WASTE&VENT, AND LOW PRESSURE GAS RISER DIAGRAMS. *** TO PC: PREV APPROVED SET IS AN EPLAN *** · 2026-08-13
25042-10000-16048
PC Info Complete
PLUMBING T.I. INCLUDES POTABLE WATER, WASTE/VENT WITH SEWAGE EJECTOR AND LOW PRESSURE GAS. (E) 1.5" WATER METER, WITH BACKFLOW DEVICE. · 2026-05-28
NO WORK TO BE DONE. This to capture fees for a courtsey inspection. Inpector to verify gravity flow and use of sewage ejector for tenant. · 2026-05-12
25041-10000-40287
PC Info Complete
(EPlan) REUSE (E) ELECTRICAL DISTRIBUTION PANELS AND PROVIDE NEW ELECTRICAL DISTRIBUTION PANELS TO ACCOMMODATE NEW KITCHEN EQUIPMENT LOADSRE-USE (E) LIGHTI FIXTURES AND PROVIDE NEW LIGHT FIXTURE & ASSOCIATED LIGHTINGCONTROLS IN COMPLIANCE WITH T24. NEW BRANCH CIRCUITING FOR GENERAL RECEPTACLES, KITCHEN EQUIPMENT, HVAC AND PLUMBING EQUIPMENT.BUILDING PERMIT 25016-10000-24618: "CHANGE A PORTION ON THE 2ND FLOOR OF A 2-STORY · 2026-04-01